Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Northstar Commuter Rail
532 documents, those that name it most first. The line's own page
The first 300 are shown.
- February 2021 Northstar Commuter Rail Extension Feasibility Assessment: Summary Report
- February 2006 Northstar Corridor Project Special Review
- 31 March 2023 Northstar Rail Corridor Post-Pandemic Study final report
- February 2006 Full eas
- 22 December 2005 Northstar Corridor Rail Project Environmental Assessment / Draft 4(f) Evaluation
- February 2024 Northstar Commuter Rail extension, Big Lake to St. Cloud: legislative report
- February 2006 Findingsoffactandconclusions
- 23 February 2006 Northstar Findings of Fact and Conclusions / Final Section 4(f) Evaluation
- March 2023 Northstar Post-Pandemic Study Appendix A: Corridor history and existing conditions
- June 2024 BLE SDEIS Appendix A 4 Cultural Resources Docu-(1)
- March 2023 Appendix B Peer Corridor Review Technical Report
- May 2011 Regional Transitway Guidelines Technical Report
- 2002 Northstar Corridor Record of Decision (references 1998-1999 studies, 2000 DEIS, 2002 FEIS)
- 2005 Northstar EA: introduction and chapters 1-2 (MnDOT passenger rail reports)
- March 2023 Appendix D Evaluation Methods Technical Report
- 2022 Metropolitan Area Transit Finance Report
- 2010 2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan (LRL copy)
- February 2010 2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan, final report (original MnDOT address)
- November 2015 2015 Legislative Report: Guideway Status (incl. NLX, Zip Rail, TCMC, Northstar)
- December 2009 DraftSRPFinalReport
- December 2007 Full Funding Grant Agreement
- 2018 Metropolitan Area Transit Finance Report
- 2013 CTIB annual report to the Legislature (2013)
- 2021 Legislative report with TCMC Phase 1 study and Twin Cities-Milwaukee HSR sections
- 2020 Metropolitan Area Transit Finance Report
- 2004 Northstar work group legislative report
- 2009 Bus Study Full Report
- 2014 CTIB annual report to the Legislature (2014)
- 2018 Southwest LRT Amended ROD-( )
- 2000 Commuter Rail System Plan
- 16 February 2018 Southwest LRT Supplemental Environmental Assessment
- February 2018 Southwest LRT Supplemental Environmental Assessment
- November 2009 DraftTechMemo6
- January 2008 Final AA Report 61 120part2
- February 2006 Chap4 41 76
- April 2015 DraftMNStateRailPlan
- 2013 Northstar Corridor Rail Project Before-and-After Study
- April 2015 Southwest LRT FEIS AppN
- April 2016 Southwest LRT FEIS AppM
- August 2012 SW DEIS appE
- August 2012 SW DEIS appE Agency Coordination
- 2017 Annual Regional Park and Ride System Report
- April 2016 Southwest LRT FEIS Appendix M SDEIS Part 3
- March 2023 Appendix C Rail Extension Technical Report
- 14 January 2009 2030 Transportation Policy Plan (adopted Jan 14, 2009)
- 2015 2040 Transportation Policy Plan (adopted Jan 2015)
- July 2009 DraftTechMemo3
- 2010 ParkRideSurveyReport pdf
- 2007 Southwest Transitway Alternatives Analysis final report (HCRRA, 2007)
- September 2011 TransitwaysUserGuidesTransitwayRunningwayUserGuide
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 3
- May 2018 Southwest LRT Findings of Fact and Conclusions-(20
- November 2017 Southwest LRT Section 106 Assessment of Effects fo
- August 2001 Commuter Feasibility Study Executive Summary
- 2009 Evaluation TransitEvalFullReport pdf
- April 2016 Runningway Guidelines User Guide
- November 2014 2030 Park and Ride Plan and Appendices
- January 2008 Final AA Report 121 190part3
- 2009 Southwest Transitway Scoping Summary Report (HCRRA, 2009)
- 8 August 2011 TSAAP RFP FINAL
- 2015 Annual Regional Park and Ride System Report
- 2014 2040 Transportation Policy Plan (2014 public draft)
- August 2001 Appendix d
- 2016 Park and Ride System Report
- May 2015 Red Rock Previously Completed Work Memo
- December 2017 Southwest LRT Supplemental Environmental Assessment Append
- August 2008 2030transitmasterstudy
- August 2001 Appendix b
- February 2006 Chap5 79 81
- 2024 Metropolitan Area Transit Finance Report
- March 2015 Annual Regional Park and Ride System Report
- June 2024 BLE SDEIS Appendix A 9 Agency Coordination and Eng
- July 2017 Dan Patch Corridor Commuter Rail Feasibility Study
- January 2008 Final AA Report 1 60part1
- September 2011 TransitwaysUserGuidesTransitwayStationsSupport-(1)
- September 2016 Appendices
- February 2006 Chap3 21 28
- August 2009 DraftTechMemo4
- 12 February 2025 Imagine 2050 Transportation Policy Plan: Transit Investment Plan (accessible PDF page)
- undated LRL research guide: Light Rail and Commuter Transit timeline (with call numbers)
- September 2006 Northstar Corridor Rail Project Design Criteria
- January 2008 Red Rock Corridor Alternative Analysis Executive Summary
- December 2013 Agenda
- August 2013 Agenda
- January 2009 Appendix J 2
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 4
- 14 October 2020 2040 TPP 2020 update: Chapter 6 Transit (TAB draft, Oct 2020)
- 2015 2040 TPP Chapter 6: Transit Investment Direction and Plan (v1.0)
- August 2019 Chapter 6 Transit Investment Direction and Plan
- March 2016 Station and Support Facility Design Guidelines Use
- September 2012 SW DEIS appH 2
- September 2012 SW DEIS appH 2 Supporting Technical Reports and Me
- July 2015 Tracking the Blue Line Extension Issue 3-(July 201
- February 2015 2
- 15 December 2004 2030 Transportation Policy Plan (adopted Dec 15, 2004)
- 1 August 2006 Access Minneapolis: Downtown Transit Circulation Concept final report
- March 2015 AppendixC
- March 2024 Ns twins 24 final d
- March 2024 Ns twins 24 final g
- March 2024 Ns twins 24 final h
- March 2024 Ns twins 24 final I
- March 2025 NS Twins 25 H
- April 2018 Public Comments on the Southwest LRT SEA Amended Draft Sec
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 2
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 7
- 2020 Annual Park and Ride System Report
- 2025 Annual Regional Park and Ride System Report
- 2018 Annual Regional Park and Ride System Report
- 2021 Annual Regional Park and Ride System Report
- September 2024 Network now report
- March 2014 Northstar twinsscheduleg
- March 2024 Ns twins 24 final a
- March 2024 Ns twins 24 final b
- March 2024 Ns twins 24 final f
- March 2025 NS Twins 25 B
- March 2025 NS Twins 25 F
- March 2025 NS Twins 25 G
- March 2025 NS Twins 25 J
- August 2024 Ns vikings schedule mondays
- August 2024 Ns vikings schedule sundays
- 2019 Park and Ride Report
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 6
- May 2010 SW DEIS appH 1
- May 2010 SW DEIS appH 1 Supporting Technical Reports and Me
- January 2012 TechMemo10
- March 2008 TEMS Appendices
- March 2016 Twins schedd
- March 2016 Twins schedg
- May 2013 Z fold anokacrtv
- 2015 2015 Minnesota GO State Rail Plan, Chapter 3: Proposed passenger rail improvements
- July 2016 METRO Blue Line LRT Extension Final EIS (full report)
- November 2012 Northstar
- July 2024 Northstar twins 1205start
- April 2011 Northstar twinsschedulef
- October 2013 Packet Addendum AAU Tech Memos 3 6
- February 2012 Regional Transitway Guidelines (final)
- March 2016 RegionalTransitwayGuidelines pdf
- April 2016 Southwest LRT FEIS Ch07
- 2006 Southwest Transitway AA Tech Memo 3: Definition of alternatives (lists 1981-2003 predecessor studies)
- March 2016 Twins schedb
- July 2016 Twins schede
- July 2016 Twins schedf
- February 2015 6
- February 2009 Appendix J 1
- February 2016 Bottineau LRT FEIS Appendix F 11 Financial Analysis Technic
- February 2015 Execsum
- February 2013 Gateway Corridor Alternatives Analysis Final Report
- February 2012 Metrotransit.org sysmap map system
- May 2013 Red line how to
- October 2016 Sec106 historic resources documentation
- August 2001 Section1 final
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 5
- February 2008 TEMS C 3
- 2018 TPP Update Public Comment Report
- 2019 2040 TPP overview, October 2018 update with 2019 amendments
- 2018 2040 Transportation Policy Plan Update Overvi
- June 2022 Addendum Bottineau LRT Route Modification Report F
- 2024 Annual Park and Ride System Report
- 2023 Annual Regional Park and Ride System Report
- March 2025 Appendix a route changes metrotransit 030925 reduced
- January 2009 Appendix B
- March 2015 AppendixD
- May 2012 Bottineau LRT Scop Comp LRT BRT Memo
- May 2012 Bottineau LRT Scop Decision App B
- 2015 C 31 Council u Safety and Security Management
- April 2013 CAC 7Nov13 HC Programs
- September 2008 Ch6 methodology
- February 2006 Chap6 82 85
- June 2019 Chapter 4 Transportation Finance
- January 2015 DRAFT Minnesota GO Statewide Rail Plan
- January 2011 Final Document web version
- February 2017 Getting From Here to There: Funding Transit in the Region
- 7 July 2011 INTRO
- 22 February 2012 INTRO .compressed
- September 2009 LPA TM5 Transit Service DRAFT 090909
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- May 2011 Red Rock Corridor Meeting Minutes
- 27 May 2010 RRCC Agenda Packet
- 29 April 2010 RRCC agenda packet
- October 2019 Transportation Resources
- February 2015 1
- June 2015 2040 TPP Chapter 4 Transportation Finance
- July 2009 AA Tech Memo 6
- May 2013 Alternative analysis summary report (PDF)
- 2022 Annual Regional Park and Ride System Report
- May 2016 Bottineau LRT FEIS Appendix H 4a Section 106 Determination
- July 2016 Bottineau LRT FEIS Chapter 10 Financial Analysis
- December 2011 Bottineau LRT Scop Booklet
- December 2013 Bottineau Transitway Health Impact Assessment – final report (PDF)
- 2015 C 23 Council m Travel Demand Methodology and F
- June 2009 Central Corridor LRT Final EIS: Chapter 2 Alternatives Considered
- October 2023 Chapter2 networkperformanceandopportunities 100423
- April 2009 DraftTechMemo7 8
- December 2009 DraftTechMemo9
- November 2017 Extending Tracks Issue 18
- 2012 Hess Roise and Company
- July 2013 Midtown corridor initial screening memo
- July 2012 Program of Projects Workshop Presentation
- 28 May 2009 PTACPres
- April 2016 Southwest LRT FEIS Appendix M SDEIS Part 2
- April 2016 Southwest LRT FEIS Ch02
- April 2016 Southwest LRT FEIS Ch04
- October 2012 Southwest Transitway Draft EIS Chapter 1: Purpose and Need
- September 2012 SW DEIS ch1 Purpose and Need
- January 2013 SW DEIS Cmt Agencies 1
- February 2008 TEMS C 1 2
- February 2015 Tracking the Blue Line Extension Issue 1-(February
- April 2015 00 SIP FinalReport inclAppendices
- February 2015 4
- 2010 4 29 RRCC Minutes
- July 2009 AA Tech Memo 5
- July 2009 AA Tech Memo 8
- April 2012 Agenda
- October 2013 Agenda
- February 2012 Agenda
- February 2006 Appendix
- May 2025 Appendix A 4 Cultural Resources
- December 2020 Arterial BRT Corridor Concepts - December 2020
- June 2024 BLE SDEIS Appendix A CR Preparation Notices Commen
- July 2017 Bottineau Corridor housing inventory (PDF 5MB)
- June 2016 Bottineau LRT FEIS Appendix H 3 Section 106 Consultation Me
- March 2014 Bottineau Transitway Draft EIS
- 2009 Bus Study Summary Report
- 2015 C 11 Council a Communications and Public Invol
- 2015 C 12 Council b PEC East Traffic Technical Memo
- January 2014 Categorized comments from Southwest LRT Minneapolis commun
- June 2009 Central Corridor LRT Final EIS: Chapter 1 Purpose and Need
- June 2009 Central Corridor LRT Final EIS: Executive Summary
- December 2010 Central Corridor TOD Investment Framework: a Corridor Implementation Strategy
- January 2014 Ch 1 introduction.ashx
- January 2014 Ch 2 royalston
- December 2023 East Metro Transit Network Opportunities final report
- February 2010 Executive Summary SA
- September 2016 Extending Tracks Issue 15
- August 2023 Final Corridor Plan (Aug. 9, 2023)
- February 2018 Findings of Fact and Conclusions: Northern Lights Express Passenger Rail Project from Minneapolis to Duluth, Minnesota
- 2026 Hennepin County transit page (funded transitways, under-study corridors)
- December 2001 Hiawatha Avenue Light Rail Transit Line, December 31, 2001: Special Review
- December 2002 Hiawatha Avenue Light Rail Transit Line, December 31, 2002: Special Review
- August 2010 Hiawatha LRT Before and After Study (incl. 30-year planning history)
- April 2018 Highway 169 Mobility Study Implementation Plan
- 2014 Highway Transitway Corridor Study Tech Memo 2
- July 2017 Housing inventory (PDF)
- 2013 Kimley Horn and Associates Inc
- 18 April 2012 Midtown Corridor AA scope of work
- February 2016 MN Minneapolis Southwest LRT Profile FY17
- March 2015 OHRound2summaries
- 10 December 2008 PAC Minutes
- July 2016 Record of Decision, Southwest LRT
- January 2011 Red Rock Corridor Agenda
- November 2011 Red Rock Corridor Agenda
- April 2025 Regional Transportation Finance
- 28 November 2012 Revised Chapter 8 with Cover
- 29 August 2013 RRCC Minutes
- August 2001 Section4 final
- 2024 See the adopted sales and use transportation tax implementation plan – 2024 (PDF, 1MB)
- April 2015 SIP FinalReport Ch03
- August 2015 Southwest LRT FEIS AppG
- April 2016 Southwest LRT FEIS Ch01
- April 2016 Southwest LRT FEIS Ch03
- September 2015 Southwest LRT Flyover Visualization Narration,-Sep
- July 2016 Southwest LRT Record of Decision-( )
- April 2014 Southwest LRT SDEIS Appendix K Public Notices
- March 2018 Southwest LRT Supplemental Environmental Assessment To-(1)
- March 2015 SPO StationArchitecture SC 19
- July 2009 SRCPres
- June 2024 Supplemental Draft EIS: Chapter 1 Purpose and Need
- 2025 Supplemental Final EIS: Chapter 1
- September 2012 SW DEIS ch6
- September 2012 SW DEIS ch6 Transportation Effects
- November 2012 SW DEIS ch8
- May 2014 SW Steering Comm Packet 15 FINAL v1 0.ashx
- 2019 Transit System Performance Evaluation
- November 2015 Transitway Stations Planning Status for Local Comp
- 21 February 2012 TSAAP FINAL release
- 15 April 2015 West broadway memo 3 conceptdevelopmentofalternatives final
- October 2022 Draft Corridor Plan (Oct. 24, 2022)
- April 2023 Recommended Corridor Plan (April 12, 2023)
- August 2022 00 05 402229 22 f line map
- 2010 1 28 RRCC Minutes
- July 2010 21st Street Barriers to Access2
- July 2010 21st Street Transit Routes
- July 2010 21st StreetBikeways Sidewalks
- July 2010 21st StreetOD2
- 26 October 2016 7 Item 4b RRCC Minutes
- February 2024 A Vision for Serving and Connecting the Red Rock Corridor Vision Refresh Final Report 01312024
- March 2008 AA Tech Memo 7
- May 2025 Abstract
- 2007 Access Minneapolis program overview slides (incl. Streetcar Feasibility Study)
- January 2013 Agenda
- June 2024 Appendix A-9 Chapter 9: Agency Coordination
- 7 May 2021 Arterial Bus Rapid Transit presentation (May 7, 2021)
- June 2024 BLE SDEIS A 3 Transportation
- June 2024 BLE SDEIS Abstract
- June 2024 BLE SDEIS Chapter 10 Financial Analysis
- June 2024 BLE SDEIS Chapter 6 Indirect Impacts and Cumulativ
- May 2025 Blue Line Extension Chapter 10 Financial Analysis
- May 2025 Blue Line Extension Chapter 6 Cumulative Potential Effects (per MN Rules § 4410), Reasonably Foreseeable Trends and Future Plans
- July 2016 Blue Line Extension Final EIS Chapter 1: Purpose and Need
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.