TRANSIT LIBRARY

Northstar Post-Pandemic Study Appendix A: Corridor history and existing conditions

Open the PDF (3.8 MB)

Date
March 2023
Kind
Technical report
From
SRF Consulting for Metropolitan Council
File
PDF, 59 pages, 3.8 MB
Published as
Appendix-A-Corridor-History-and-Existing-Condition.aspx
Titled inside
Appendix A: Corridor History and Existing Conditions Technical Report
Published at
https://metrocouncil.org/Transportation/Publications-And-Resources/Transit/COMMUTER-RAIL/2023-Northstar-Rail-Corridor-Post-Pandemic-Study/Appendix-A-Corridor-History-and-Existing-Condition.aspx (still there when last looked)
This copy
from the site that published it
SHA-256
584d4f34d502082f4506b2e0b232c807795ee67065455364a25016e125a51ed5
Filed under
Northstar Corridor, Plans of the whole region
Names these lines
Northstar Commuter Rail ×107, Route 850 ×1
Also published at
https://metrocouncil.org/Transportation/Publications-And-Resources/Transit/COMMUTER-RAIL/2023-Northstar-Rail-Corridor-Post-Pandemic-Study/Appendix-A-Corridor-History-and-Existing-Condition.aspx%5C
♫ NOW PLAYING
No track loaded
0:00
🔊