Northstar Post-Pandemic Study Appendix A: Corridor history and existing conditions
- Date
- March 2023
- Kind
- Technical report
- From
- SRF Consulting for Metropolitan Council
- File
- PDF, 59 pages, 3.8 MB
- Published as
- Appendix-A-Corridor-History-and-Existing-Condition.aspx
- Titled inside
- Appendix A: Corridor History and Existing Conditions Technical Report
- Published at
- https://metrocouncil.org/Transportation/Publications-And-Resources/Transit/COMMUTER-RAIL/2023-Northstar-Rail-Corridor-Post-Pandemic-Study/Appendix-A-Corridor-History-and-Existing-Condition.aspx (still there when last looked)
- This copy
- from the site that published it
- SHA-256
- 584d4f34d502082f4506b2e0b232c807795ee67065455364a25016e125a51ed5
- Filed under
- Northstar Corridor, Plans of the whole region
- Names these lines
- Northstar Commuter Rail ×107, Route 850 ×1
- Also published at
- https://metrocouncil.org/Transportation/Publications-And-Resources/Transit/COMMUTER-RAIL/2023-Northstar-Rail-Corridor-Post-Pandemic-Study/Appendix-A-Corridor-History-and-Existing-Condition.aspx%5C