- Holds
- Transportation Policy Plan, transitway guidelines, guideway status reports, Network Now
- Documents
- 160
Key documents
- 12 February 2025 Imagine 2050 Transportation Policy Plan: Transit Investment Plan (accessible PDF page)
- 12 February 2025 2050 TPP adoption packet, Section 1: Overview (Feb 12, 2025 Council meeting)
- 27 January 2025 Business item: adopt 2050 Transportation Policy Plan and accept public comment report
- September 2023 Network Now Chapter 1: Regional policy guidance (draft)
- 31 March 2023 Northstar Rail Corridor Post-Pandemic Study final report
- March 2023 Northstar Post-Pandemic Study Appendix A: Corridor history and existing conditions
- 14 October 2020 2040 TPP 2020 update: Chapter 6 Transit (TAB draft, Oct 2020)
- 2019 2040 TPP overview, October 2018 update with 2019 amendments
- 2015 2040 Transportation Policy Plan (final, with 2018 and 2020 updates)
- 2015 2040 Transportation Policy Plan (adopted Jan 2015)
- 2015 2040 TPP Chapter 6: Transit Investment Direction and Plan (v1.0)
- 2014 CTIB annual report to the Legislature (2014)
- 2014 2040 Transportation Policy Plan (2014 public draft)
- 2013 CTIB annual report to the Legislature (2013)
- February 2012 Regional Transitway Guidelines (final)
- 2012 Regional Transitway Guidelines, Chapter 1: Introduction
- May 2011 Regional Transitway Guidelines Technical Report
- January 2011 Cedar Avenue BRT fact sheet
- 14 January 2009 2030 Transportation Policy Plan (adopted Jan 14, 2009)
- 15 December 2004 2030 Transportation Policy Plan (adopted Dec 15, 2004)
Everything else found (140)
Studies, plans and reports (91)
2026
2025
- April 2025 Transit Design and Performance Guidelines
- April 2025 TDM Investment Plan
- April 2025 Pedestrian Investment Plan
- April 2025 Highway Investment Plan
- April 2025 Freight Investment Plan
- April 2025 Evaluation and Performance
- April 2025 Bicycle Investment Plan
- April 2025 Aviation System Plan
- March 2025 Networknow appendix c evaluation process and results 030925
- March 2025 Appendix a route changes metrotransit 030925 reduced
- February 2025 Transit Fare Elimination Pilot Program Report
- February 2025 Appendix b networknow engagementsummary 022725
- 2025 Transitways of the 2040 plan's increased revenue scenario: GIS layer (GeoPackage)
- 2025 Nn title vi service equity analysis
- 2025 Annual Regional Park and Ride System Report
2024
- September 2024 Network now report no appendicies small
- September 2024 Network now report appendix c small
- September 2024 Network now report appendix c
- September 2024 Network now report appendix b
- September 2024 Network now report appendix a
- September 2024 Network now report
- August 2024 Network now report executive summary
- August 2024 Network now final report rsv
- August 2024 Network now executive summary rvs
- 2024 Performance Evaluation for
- 2024 Metropolitan Area Transit Finance Report
- 2024 Annual Park and Ride System Report
2023
- October 2023 Establishingthefoundation report 100423
- October 2023 Chapter2 networkperformanceandopportunities 100423
- March 2023 Appendix D Evaluation Methods Technical Report
- March 2023 Appendix C Rail Extension Technical Report
- March 2023 Appendix B Peer Corridor Review Technical Report
- 2023 Regional Route Performance Analysis for
- 2023 Annual Regional Park and Ride System Report
2022
- 2022 Regional Route Performance Analysis for
- 2022 Metropolitan Area Transit Finance Report
- 2022 Annual Regional Park and Ride System Report
2021
2020
- 2020 Regional Route Performance Analysis for
- 2020 Metropolitan Area Transit Finance Report
- 2020 Annual Park and Ride System Report
2019
- December 2019 Chapter 9 Aviation Investment Direction and Plan
- December 2019 Appendix L Aviation Land Use Compatibility Guideli
- November 2019 Chapter 2 Transportation Strategies
- August 2019 Chapter 6 Transit Investment Direction and Plan
- August 2019 Appendix K Airport Long Term Comprehensive Plans
- July 2019 Appendix I Regional Airspace
- July 2019 Appendix H National and State Airport Classificati
- July 2019 Appendix G Regional Transit Design Guidelines and
- July 2019 Appendix F Preliminary Interchange Approval
- July 2019 Appendix E Additional Air Quality Information
- July 2019 Appendix D Functional Classification Criteria and
- June 2019 Chapter 8 Freight Investment Direction
- June 2019 Chapter 7 Bicycle and Pedestrian Invetment Directi
- June 2019 Chapter 5 Highway Investment Directon and Plan
- June 2019 Chapter 4 Transportation Finance
- June 2019 Chapter 3 Land Use and Local Planning
- June 2019 Chapter 14 Work Program
- June 2019 Chapter 12 Congestion Management Process
- June 2019 Chapter 11 Environment Air Quality
- June 2019 Appendix C Long Range Highway and Transit Capital
- June 2019 Appendix A Glossary
- 2019 Transit System Performance Evaluation
- 2019 Regional Route Performance Analysis
- 2019 Regional Route Performance Analysis
- 2019 Regional Route Performance Analysis
- 2019 Park and Ride Report
2018
- November 2018 Chapter 1 Strategic Vision for Planning
- 2018 Metropolitan Area Transit Finance Report
- 2018 Annual Regional Park and Ride System Report
2017
2016
- April 2016 Runningway Guidelines User Guide
- March 2016 Station and Support Facility Design Guidelines Use
- March 2016 RegionalTransitwayGuidelines pdf
- March 2016 Regional Transitway Guidelines Resource List
- 2016 Park and Ride System Report
2015
- June 2015 2040 TPP Chapter 4 Transportation Finance
- June 2015 2040 TPP Appendix G Transit Design and Perf Standa
- March 2015 Annual Regional Park and Ride System Report
- 2015 Annual Regional Park and Ride System Report
2014
- November 2014 2030 Park and Ride Plan and Appendices
2012
- February 2012 Travel Demand Forecasting User Guide
- 2012 2016 Regional Service Improvement Plan-(RSIP)
2011
- September 2011 TransitwaysUserGuidesTransitwayRunningwayUserGuide
2009
- January 2009 Appendix K
- 2009 Evaluation TransitEvalFullReport pdf
2008
2006
- September 2006 Northstar Corridor Rail Project Design Criteria
Meetings: agendas, presentations, minutes (3)
2023
- April 2023 Phase 1 public workshop presentation
2019
2012
Outreach: fact sheets, open houses, engagement (11)
2024
- September 2024 NN OneSheet VIETNAMESE
- September 2024 NN OneSheet SPANISH
- September 2024 NN OneSheet SOMALI
- September 2024 NN OneSheet LAO
- September 2024 NN OneSheet KAREN
- September 2024 NN OneSheet HMONG
- September 2024 NN OneSheet English
2023
- October 2023 Chapter3 engagement andcustomerfeedback 100423
2018
2010
Maps, figures and drawings (3)
2025
2015
- November 2015 Transitway Stations Planning Status for Local Comp
2011
- September 2011 TransitwaysUserGuidesTransitwayStationsSupport-(1)
Web pages and guides (3)
2026
Other documents (27)
2025
- April 2025 Work Program
- April 2025 Regional Transportation Finance
- April 2025 Preliminary Interchange Approval Process
- April 2025 Policies and Actions
- April 2025 Overview
- April 2025 Long Range Capital Project Lists
- April 2025 Functional Classification
- April 2025 Congestion Management Process
- April 2025 Aviation Supporting Information
- March 2025 Networknowframework final 031025
- March 2025 Networknowframework 031025
- March 2025 Final executivesummary 031025
2023
- October 2023 Executivesummary 100423
- March 2023 Network now one pager
- January 2023 Networknow onepager
2019
- August 2019 Chaptper 13 Performance Outcomes
- June 2019 2040 TPP Gold Line 1 94 Amendment
- February 2019 2040TppRiverviewAmend
2018
- June 2018 State Transit Funding Revenue Allocation Procedure
- June 2018 State Transit Funding Revenue Allocation Policy
2014
- May 2014 HTCSFinal
2013
- May 2013 Transitways2030Transitways pdf
2011
- September 2011 HiawathaLRTFacts pdf
- August 2011 CedarBRTFONSI pdf
2009
- December 2009 Requirements for Federal Transit Grantees and Subr
- November 2009 TransitLinkDARHandout pdf
2008
- August 2008 2030transitmasterstudy