Bottineau Transitway Draft EIS
- Date
- March 2014
- Kind
- Environmental document
- From
- Hennepin County Regional Railroad Authority / FTA (LRL copy)
- File
- PDF, 834 pages, 170 MB
- Published as
- 140464.pdf
- Published at
- https://www.leg.mn.gov/docs/2014/other/140464.pdf (still there when last looked)
- This copy
- from the site that published it
- SHA-256
- 68b1d5f5aea5df40896f2ce583d7cec9be1c573f38da7f08266e09e9c5e7a689
- Filed under
- Bottineau Corridor, Archives, catalogues and research guides
- Names these lines
- METRO Blue Line ×29, METRO Green Line ×26, METRO Red Line ×7, METRO Orange Line ×6, Northstar Commuter Rail ×2, Route 7 ×2, Route 705 ×2, Route 724 ×2, Route 5 ×1, Route 14 ×1, Route 22 ×1, Route 32 ×1, Route 716 ×1, Route 721 ×1, Route 722 ×1, Route 723 ×1, Route 760 ×1, Route 764 ×1, Route 765 ×1, Route 781 ×1
- Also published at
- http://www.leg.state.mn.us/docs/2014/other/140464.pdf