Facts
- Year opened
- 2004
- Length
- 12.2 mi
- Stations
- 20
- Operator
- Metro Transit
- Vehicle
- Placeholder lrt vehicle (1-car consist)
Ridership
16,995 boardings on a weekday, counted at the stops in autumn 2025. The official weekday average for 2025 was 15,778.
The figures, year by year
| Year | Weekdays | Saturdays | Sundays | Rides in the year | |||
|---|---|---|---|---|---|---|---|
| Counted | Official | Counted | Official | Counted | Official | ||
| 2018 | ‡ | 32,663 | ‡ | 28,045 | ‡ | 23,658 | 11,159,414 |
| 2019 | ‡ | 32,715 | ‡ | 26,787 | ‡ | 22,588 | 11,045,239 |
| 2020 | 7,936† | — | 7,071† | — | 6,438† | — | — |
| 2021 | 10,079† | — | 8,837† | — | 11,122† | — | — |
| 2022 | 17,250† | 14,685 | 15,962† | 15,307 | 17,235† | 15,028 | 5,411,954 |
| 2023 | 18,935† | 18,001 | 18,833† | 18,389 | 19,229† | 17,038 | 6,534,612 |
| 2024 | § | 17,330 | § | 16,942 | § | 17,931 | 6,357,556 |
| 2025 | 16,995 | 15,778 | 17,147 | 15,746 | 18,705 | 14,934 | 5,708,508 |
Counted: average boardings a day in the Met Council's autumn stop counts, added up over the line's stops. Shown for a year only when at least nine in ten of its stops were counted.
Official: the average for the whole year, and the rides in the year, from the Regional Route Performance Analysis, which is published for 2018, 2019 and 2022 onward.
The two are counted differently and do not match exactly: the stop counts leave out unusual days and cover the autumn only.
‡ The rail lines have no usable stop counts before 2020: most stations' figures were withheld.
† A few of the line's stops had no figure that year, so the total is a little low.
§ Too many of the line's stops have no figure that year for a total.
Hiawatha Corridor — METRO Blue Line
This page is a placeholder. The full deep-dive — history, planning, alignment alternatives, future extensions — will land here as Phase 2 content authoring gets underway.
The Blue Line is the older of the Twin Cities' two operating light-rail corridors. It runs from Target Field Station in downtown Minneapolis south through the Hiawatha corridor to Mall of America in Bloomington, calling at Minneapolis–Saint Paul International Airport along the way.
Phases
- 2004-06-26 — Initial revenue service, Warehouse District → Fort Snelling
- 2004-12-04 — Extended to Mall of America via the airport tunnel
- 2009-11-14 — Northern extension to Target Field Station
Related reading
Planning documents
- Hiawatha Corridor 5 Hiawatha Line, Route 55, METRO Blue Line
- Bottineau Corridor 564 Bottineau Transitway, METRO Blue Line Extension
Filed elsewhere in the library, the documents that name METRO Blue Line most:
- 2007 Southwest Transitway Alternatives Analysis final report (HCRRA, 2007)
- 2009 Southwest Transitway Scoping Summary Report (HCRRA, 2009)
- 2021 Legislative report with TCMC Phase 1 study and Twin Cities-Milwaukee HSR sections
- November 2015 2015 Legislative Report: Guideway Status (incl. NLX, Zip Rail, TCMC, Northstar)
- 2006 Southwest Transitway AA Tech Memo 3: Definition of alternatives (lists 1981-2003 predecessor studies)
- 2014 CTIB annual report to the Legislature (2014)
- 2013 CTIB annual report to the Legislature (2013)
- April 2015 Southwest LRT FEIS AppN