Legislative report with TCMC Phase 1 study and Twin Cities-Milwaukee HSR sections
- Date
- 2021
- Kind
- Legislative report
- From
- MnDOT (LRL copy)
- File
- PDF, 208 pages, 10 MB
- Published as
- 210373.pdf
- Titled inside
- 2020 Transit Investment Report
- Published at
- https://www.lrl.mn.gov/docs/2021/mandated/210373.pdf (still there when last looked)
- This copy
- from the site that published it
- SHA-256
- 14adeab2a51b42c19749960feebcae940eef27442870bc435e885fc1f60938fd
- Filed under
- Twin Cities-Milwaukee-Chicago Corridor
- Names these lines
- METRO Blue Line ×82, METRO Green Line ×82, METRO Orange Line ×49, METRO Red Line ×44, Northstar Commuter Rail ×43, METRO A Line ×26, METRO B Line ×26, METRO D Line ×24, METRO Gold Line ×23, METRO E Line ×21, METRO C Line ×20, Route 363 ×7, Route 5 ×2, Route 801 ×1, Route 32 ×1