METRO D LINE

Facts

Year opened
2022
Length
18.6 mi
Stations
41
Operator
Metro Transit
Vehicle
Placeholder local_bus vehicle (1-car consist)

Ridership

14,015 boardings on a weekday, counted at the stops in autumn 2025. The official weekday average for 2025 was 13,683.

The figures, year by year
Year Weekdays Saturdays Sundays Rides in the year
Counted Official Counted Official Counted Official
2022 — 590 — 587 — 324 199,972
2023 14,027 11,737 11,578 9,782 10,202 8,432 3,990,708
2024 13,966† 13,600 11,016† 11,223 9,811† 9,811 4,634,103
2025 14,015 13,683 11,586 10,951 9,920 9,611 4,616,046

Counted: average boardings a day in the Met Council's autumn stop counts, added up over the line's stops. Shown for a year only when at least nine in ten of its stops were counted.

Official: the average for the whole year, and the rides in the year, from the Regional Route Performance Analysis, which is published for 2018, 2019 and 2022 onward.

The two are counted differently and do not match exactly: the stop counts leave out unusual days and cover the autumn only.

† A few of the line's stops had no figure that year, so the total is a little low.

METRO D Line

Placeholder page. Edit via the admin UI to add history, planning notes, photos, and analysis.

Currently a local bus route operated by Metro Transit.

Planning documents

Filed elsewhere in the library, the documents that name METRO D Line most:

All 198 documents that name it →

The whole transit library →

♫ NOW PLAYING
No track loaded
0:00
🔊