Facts
- Year opened
- 2014
- Length
- 10.9 mi
- Stations
- 24
- Operator
- Metro Transit
- Vehicle
- Placeholder lrt vehicle (1-car consist)
Ridership
23,434 boardings on a weekday, counted at the stops in autumn 2025. The official weekday average for 2025 was 22,369.
The figures, year by year
| Year | Weekdays | Saturdays | Sundays | Rides in the year | |||
|---|---|---|---|---|---|---|---|
| Counted | Official | Counted | Official | Counted | Official | ||
| 2018 | ‡ | 42,238 | ‡ | 32,389 | ‡ | 23,125 | 13,796,204 |
| 2019 | ‡ | 43,659 | ‡ | 32,683 | ‡ | 24,511 | 14,254,202 |
| 2020 | § | — | 11,705† | — | 9,666† | — | — |
| 2021 | § | — | 14,034† | — | 12,525† | — | — |
| 2022 | 24,208† | 20,480 | 19,358† | 17,196 | 16,721† | 14,344 | 6,954,678 |
| 2023 | 29,331† | 24,311 | 24,066† | 20,616 | 19,706† | 16,380 | 8,221,281 |
| 2024 | § | 26,736 | § | 23,025 | 17,407† | 18,792 | 9,131,638 |
| 2025 | 23,434 | 22,369 | 19,606 | 18,680 | 16,293 | 14,932 | 7,541,564 |
Counted: average boardings a day in the Met Council's autumn stop counts, added up over the line's stops. Shown for a year only when at least nine in ten of its stops were counted.
Official: the average for the whole year, and the rides in the year, from the Regional Route Performance Analysis, which is published for 2018, 2019 and 2022 onward.
The two are counted differently and do not match exactly: the stop counts leave out unusual days and cover the autumn only.
‡ The rail lines have no usable stop counts before 2020: most stations' figures were withheld.
† A few of the line's stops had no figure that year, so the total is a little low.
§ Too many of the line's stops have no figure that year for a total.
Central Corridor — METRO Green Line
Placeholder. The corridor's planning history is one of the richest in the Twin Cities — it deserves a full write-up.
The Green Line opened in 2014, connecting downtown Minneapolis to downtown Saint Paul via University Avenue and the University of Minnesota campus.
Planning documents
- Central Corridor 182 University Avenue corridor, Central Corridor LRT, METRO Green Line
- Southwest Corridor 864 Southwest Transitway, Southwest LRT, METRO Green Line Extension
Filed elsewhere in the library, the documents that name METRO Green Line most:
- 2021 Legislative report with TCMC Phase 1 study and Twin Cities-Milwaukee HSR sections
- November 2015 2015 Legislative Report: Guideway Status (incl. NLX, Zip Rail, TCMC, Northstar)
- June 2024 BLE SDEIS Appendix A 4 Cultural Resources Docu-(1)
- 2014 CTIB annual report to the Legislature (2014)
- 2013 CTIB annual report to the Legislature (2013)
- 2015 2040 Transportation Policy Plan (adopted Jan 2015)
- undated LRL research guide: Light Rail and Commuter Transit timeline (with call numbers)
- December 2010 Central Corridor TOD Investment Framework: a Corridor Implementation Strategy