Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name METRO Green Line
1,068 documents, those that name it most first. The line's own page
The first 300 are shown.
- April 2016 Southwest LRT FEIS AppM
- 2013 Central Corridor LRT environmental document (history of AA/DEIS, SDEIS, FEIS, infill stations EA)
- June 2013 Central Corridor Supplemental Final EIS: construction impacts on business revenue
- November 2012 RecPlan.2
- April 2016 Southwest LRT FEIS Appendix M SDEIS Part 4
- June 2024 BLE SDEIS Appendix A 4 Cultural Resources Docu-(1)
- February 2014 Finalcctransitstudyreportupdate
- June 2012 ConceptPlanReport
- June 2009 Central Corridor LRT Final EIS: Chapter 1 Purpose and Need
- August 2013 Central Corridor Amended ROD, Attachment E: 2009 FEIS response to comments
- June 2009 Central Corridor LRT Final EIS: Chapter 6 Transportation Effects
- April 2016 Southwest LRT FEIS Appendix M SDEIS Part 2
- March 2012 ExistingConditionsReport
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 3
- December 2010 Central Corridor TOD Investment Framework: a Corridor Implementation Strategy
- July 2016 Record of Decision, Southwest LRT
- July 2016 Southwest LRT Record of Decision-( )
- June 2009 Central Corridor LRT Final EIS: Chapter 2 Alternatives Considered
- June 2009 Central Corridor LRT Final EIS: Executive Summary
- 2021 Legislative report with TCMC Phase 1 study and Twin Cities-Milwaukee HSR sections
- 2020 Metropolitan Area Transit Finance Report
- 2018 Metropolitan Area Transit Finance Report
- November 2015 2015 Legislative Report: Guideway Status (incl. NLX, Zip Rail, TCMC, Northstar)
- 2022 Metropolitan Area Transit Finance Report
- June 2011 Status Report on the Implementation of Mitigation Measures -- CCLRT Construction-Related Business Impacts
- September 2024 Network now report
- April 2015 Southwest LRT FEIS AppN
- July 2015 SW SDEIS Cmt Hearing Mpls 06182015
- September 2016 Appendices
- January 2019 E line corridor survey responses
- May 2016 About Community, Not a Commute: Investing Beyond the Rail.
- February 2018 Detailed Definition of Alternatives Report #7
- April 2015 00 SIP FinalReport inclAppendices
- June 2024 BLE SDEIS Appendix A 9 Agency Coordination and Eng
- 2014 CTIB annual report to the Legislature (2014)
- March 2025 Appendix a route changes metrotransit 030925 reduced
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- February 2012 Appendix
- 2013 CTIB annual report to the Legislature (2013)
- April 2010 Light Rail Transit in the Twin Cities: the Central Corridor .
- 2009 Southwest Transitway Scoping Summary Report (HCRRA, 2009)
- 2015 2040 Transportation Policy Plan (adopted Jan 2015)
- undated LRL research guide: Light Rail and Commuter Transit timeline (with call numbers)
- August 2012 SW DEIS appE
- August 2012 SW DEIS appE Agency Coordination
- 2024 Metropolitan Area Transit Finance Report
- July 2012 Publicinvolvementreport
- 2007 Southwest Transitway Alternatives Analysis final report (HCRRA, 2007)
- July 2016 Bottineau LRT FEIS Appendix G 00 through 05 Responses To DE
- May 2011 Regional Transitway Guidelines Technical Report
- August 2015 Southwest LRT FEIS AppG
- June 2017 LPA Report Appendix A: LPA Overview
- April 2006 Phase II Architectural History Investigation for the Proposed Central Transit Corridor, Hennepin and Ramsey Counties, Minnesota
- 2014 2040 Transportation Policy Plan (2014 public draft)
- June 2022 Addendum Bottineau LRT Route Modification Report F
- November 2012 Ch4
- March 2014 Bottineau Transitway Draft EIS
- September 2009 LPA TM5 Transit Service DRAFT 090909
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- April 2020 Wayfinding report (PDF)
- March 2015 SPO StationArchitecture SC 19
- April 2012 Arterial Transitway Corridors Study final report
- July 2008 Central Corridor Light Rail Transit Design Criteri
- June 2012 ExecutiveSummary
- December 2017 Public Engagement Summary #5 with appendices (Aug-Nov 2017)
- 2012 2016 Regional Service Improvement Plan-(RSIP)
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 2
- April 2016 Southwest LRT FEIS Appendix M SDEIS Part 3
- April 2014 Southwest LRT SDEIS Appendix K Public Notices
- November 2012 Ch7
- March 2012 Chapter1IntroductionPurposeScope
- June 2012 Chapter4SImprovements
- November 2012 ExecSummary.2
- August 2024 Network now final report rsv
- September 2024 Network now report no appendicies small
- 2024 What We Heard: Public Engagement Summary Report (EPE phase)
- 14 October 2020 2040 TPP 2020 update: Chapter 6 Transit (TAB draft, Oct 2020)
- 2021 Annual Regional Park and Ride System Report
- December 2020 Arterial BRT Corridor Concepts - December 2020
- August 2019 Chapter 6 Transit Investment Direction and Plan
- July 2016 METRO Blue Line LRT Extension Final EIS (full report)
- 2020 0113 14 summary of public comments
- September 2016 Extending Tracks Issue 15
- January 2014 Midtown corridor operating plan
- 2015 C 31 Council u Safety and Security Management
- November 2012 Ch6
- June 2016 SW FEIS Comments AgenciesPublicEntities
- 2014 AECOM KHA
- 12 February 2025 Imagine 2050 Transportation Policy Plan: Transit Investment Plan (accessible PDF page)
- December 2017 Southwest LRT Supplemental Environmental Assessment Append
- June 2016 SW FEIS Comments BusinessesGroupsNonprofits
- March 2015 08 AppendixG SIPImprovementsbyRegion
- June 2018 Housing gaps analysis (PDF)
- 2013 Metropolitan Council
- December 2015 Southwest LRT FEIS AppI
- March 2015 07 AppendixF SIPImprovementsbyRt
- April 2018 Appendixe summary proposedimprovements
- 29 May 2020 Historic Context of the Riverview Modern Streetcar Corridor in Saint Paul, 1850-1980 (May 2020)
- February 2017 Hwy169NTechMemoApp
- March 2023 Southwest Light Rail Transit Construction: Metropolitan Council Decision Making
- April 2016 Southwest LRT FEIS Ch02
- March 2015 Southwest LRT SDEIS Appendix L Draft 4(f)-Evaluation Updat
- 2015 2040 TPP Chapter 6: Transit Investment Direction and Plan (v1.0)
- January 2009 Appendix J 2
- October 2019 Chapter 1
- August 2001 Commuter Feasibility Study Executive Summary
- 2000 Commuter Rail System Plan
- 30 October 2018 Fall engagement summary public final
- January 2008 Final AA Report 61 120part2
- February 2013 Gateway Corridor Alternatives Analysis Final Report
- April 2018 Highway 169 Mobility Study Implementation Plan
- November 2015 Kenilworth Landscape Design Community Meeting-(1)
- 2009 LPA Report DRAFT 9 10
- January 2013 Midtown corridor key issues memo
- May 2015 Packet v2 21
- July 2015 SW SDEIS Cmt Hearing Hopkins 06162015
- July 2015 Tracking the Blue Line Extension Issue 3-(July 201
- March 2015 11 AppendixJ NewAnnualRidesandResources
- December 2013 Agenda
- November 2012 Ch2
- March 2012 Chapter2ExistingRouteStructureandServiceLevels
- January 2008 Final AA Report 1 60part1
- July 2013 Snelling avenue rapid bus vissim evaluation final report
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 9
- 2015 C 11 Council a Communications and Public Invol
- January 2018 Existing Conditions and Market Analysis PDF
- May 2014 Highway Transitway Corridor Study Tech Memo 3: Corridor concepts and evaluation
- May 2017 LPA Report Appendix B: Public Engagement Summary #4 (draft LPA)
- December 2018 Open house comments
- 16 May 2018 Rev recommended d line station plan final
- April 2016 Southwest LRT FEIS Ch01
- May 2018 Southwest LRT Findings of Fact and Conclusions-(20
- May 2015 Southwest LRT SDEIS Signature Page,-Abstract,-Table of Con
- February 2009 Appendix J 1
- April 2018 Appendixf resourceimpacts proposedimprovements
- June 2018 D line final station plan
- January 2020 E Line Corridor Study summary report
- May 2022 Eline finalcorridorplan
- March 2022 ELine RecommendedCorridorPlan Final
- February 2017 Extending Tracks Issue 16
- 3 January 2014 Midtown AA Capital Cost Estimation Methodology and Assumptions
- May 2012 Presentation
- May 2016 Southwest LRT Final EIS: front matter / table of contents
- September 2011 TransitwaysUserGuidesTransitwayRunningwayUserGuide
- 14 January 2009 2030 Transportation Policy Plan (adopted Jan 14, 2009)
- May 2014 Bottineau LRT FEIS Appendix G 08 DEIS Comments Civic Organi
- 2015 C 15 Council e Bus Transit Operations Plan Tec
- December 2025 Draft 14th St Station Area Plan
- December 2023 East Metro Transit Network Opportunities final report
- 29 March 2024 Economic Development Analysis for the Riverview Transit Corridor (draft)
- March 2015 Packet 19
- September 2017 Rush Line Corridor Pre-Project Development Study: LPA Selection Report (final)
- 2018 Southwest LRT Amended ROD-( )
- April 2016 Southwest LRT FEIS AppH
- November 2015 Southwest LRT packet
- January 2013 SW DEIS Cmt Agencies 1
- 2018 02 draft d line station plan complete document
- August 2001 Appendix d
- September 2021 B line final corridor plan
- 2009 Bus Study Full Report
- January 2014 Ch 1 introduction.ashx
- September 2008 Ch6 methodology
- March 2012 Chapter4DemographicsandLandUse
- 3 June 2022 Comprehensive Plan Transportation chapter (adopted 2020, amended June 2022)
- 2017 Draft EA Chapter 1: Purpose and Need (Gateway Corridor)
- July 2009 DraftTechMemo3
- May 2019 E line open house boards
- May 2021 EA Appendix E: Technical Reports Part 3
- 11 November 2015 Economic development impacts of transit
- June 2013 Extending Tracks,-May
- November 2012 Intro.2
- June 2012 Introduction
- December 2016 LPA Selection Summary Report
- September 2009 LPA TM7A Capital Costs DRAFT 090909
- September 2009 LPA TM7B Operating and Maintenance Costs DRAFT 090909
- 26 October 2023 May-September 2023 Engagement Summary Report and Appendices
- February 2018 Report #8: Riverview Corridor Pre-Project Development Study (final)
- 21 January 2016 Sc packet
- September 2022 Southwest Light Rail Transit: Project Budget and Timeline
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 5
- April 2016 Southwest LRT FEIS Ch03
- April 2015 Southwest LRT SDEIS Appendix E Agency Coordination Letters
- November 2015 Sw corridor housing strategy final draft
- March 2016 Tracking the Blue Line Extension Issue 5,-March 20
- 2020 Vision plan interactive (PDF 63MB)
- 31 March 2015 A Line FINAL DCE Complete
- May 2014 Bottineau LRT DEIS Comments CivicOrgs
- May 2012 Bottineau LRT Scop Decision App B
- 2016 Central Corridor Tracker: Progress Beyond the Rail, Final Report.
- January 2014 Ch 19 implementation
- November 2012 Ch1
- June 2012 Chapter1Demographics
- June 2012 Chapter6TitleVI
- 19 June 2019 Comprehensive Plan Transportation chapter (approved June 2019)
- April 2015 DraftMNStateRailPlan
- May 2021 EA Appendix E: Technical Reports Part 1
- September 2021 Eline draftcorridorplan
- February 2017 Getting From Here to There: Funding Transit in the Region
- 2020 Joint Hearing Transcript
- September 2013 Meetingpacket 19 FINAL
- 2014 Midtown Corridor Alternatives Analysis final report
- April 2014 Midtown corridor final report low res
- January 2014 Midtown corridor ridership forecasting
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 6
- January 2016 000 recommended c line station plan complete
- June 2012 084
- February 2014 084 final
- October 2012 084.2
- July 2009 AA Tech Memo 6
- November 2020 All TAP Phase III Comments
- February 2022 AppendixC_BLRT Public Engagement Report (Dec 2021 - Jan 2022)
- November 2018 Bottineau Corridor final report (PDF)
- July 2016 Bottineau LRT FEIS Chapter 06 Indirect and Cumulative
- January 2018 Bus Rapid Transit Operations and Maintenance Costs PDF
- 2015 C 23 Council m Travel Demand Methodology and F
- October 2010 Central Corridor FEIS Addendum: agreement for LRT through University of Minnesota campus
- November 2012 Ch5
- June 2012 Chapter5Impacts
- June 2012 Chapter7Facilities
- May 2021 Complete recommended plan
- January 2021 Concept plan full reportfinal
- January 2021 E line corridor study technical memo 1
- September 2019 EA Appendix A Technical Report 1: Purpose and Need
- April 2016 Final C Line Station Plan
- January 2018 Initial Screenings and Alternatives PDF
- 17 July 2014 Meeting Packet Steering Committee Meeting 0
- January 2021 Ol connectingbus report
- 26 January 2018 Planning Commission Riverview LPA packet (Jan 26, 2018)
- 18 December 2020 Pr 60percent engagementsummary combined final.ada
- June 2023 Public Engagement Summary Report (Jan-June 2023)
- May 2021 Recommended plan report
- April 2022 Route Modification Report
- March 2014 Southwest Light Rail Transit: Kenilworth Shallow LRT Tunnels Water Resources Evaluation
- March 2014 Southwest LRT Final Report of Water Resources Evaluation-(
- November 2017 Southwest LRT Section 106 Assessment of Effects fo
- 16 February 2018 Southwest LRT Supplemental Environmental Assessment
- February 2018 Southwest LRT Supplemental Environmental Assessment
- October 2003 Southwest Rail Transit Study final report (HCRRA, 2003)
- June 2015 Station area plan (PDF 6MB)
- February 2015 Tracking the Blue Line Extension Issue 1-(February
- December 2018 Urban Land Institute Minnesota Technical Assistance Panel Report (PDF)
- June 2012 087
- 2019 2040 TPP overview, October 2018 update with 2019 amendments
- 2018 2040 Transportation Policy Plan Update Overvi
- February 2015 4
- March 2008 AA Tech Memo 7
- March 2021 Architecture History / History Background Research Report (March 2021)
- June 2024 BLE SDEIS Appendix A CR Preparation Notices Commen
- June 2024 BLE SDEIS Chapter 6 Indirect Impacts and Cumulativ
- May 2025 Blue Line Extension Chapter 6 Cumulative Potential Effects (per MN Rules § 4410), Reasonably Foreseeable Trends and Future Plans
- December 2011 Bottineau LRT Scop Booklet
- May 2012 Bottineau LRT Scop Comp LRT BRT Memo
- June 2012 Bottineau LRT Scop Decision
- July 2012 Bottineau LRT TechRept Transit Operations Plans
- December 2013 Bottineau Transitway Health Impact Assessment – final report (PDF)
- November 2012 Ch3
- October 2019 Chapter 2
- May 2013 Comments
- December 2025 Draft 10th St Station Area Plan
- February 2021 Draft corridor plan
- 2009 Evaluation TransitEvalFullReport pdf
- March 2013 Extending Tracks
- January 2008 Final AA Report 121 190part3
- February 2017 Full recommended plan appendices
- October 2012 GreenLine.2
- 2026 Hennepin County transit page (funded transitways, under-study corridors)
- 16 April 2015 Memo 2 problem statement final
- September 2024 Network now report appendix a
- 20 January 2010 PAC Minutes Final
- January 2014 Packet 16 FINAL
- 2021 Public Engagement Summary Report #1 (Sept 2020-June 2021)
- 6 June 2019 Reduced b line open house boards for web english
- May 2025 Responses to Comments on the Supplemental Draft Environmental Impact Statement
- April 2016 Runningway Guidelines User Guide
- 2014 Scoping Decision Document
- October 2016 Sec106 historic resources documentation
- January 2014 Southwest Light Rail Transit: Kenilworth Shallow LRT Tunnels Water Resources Evaluation
- January 2014 Southwest LRT Draft Report of Water Resources Evaluation-(
- April 2016 Southwest LRT FEIS AppD
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 4
- April 2016 Southwest LRT FEIS AppK
- August 2015 Southwest LRT Project Facts-( )
- March 2014 Southwest LRT Public Comments on Draft Reports Freight Rai
- May 2015 Southwest LRT SDEIS Appendix H Noise and Vibration Memoran
- April 2015 Station Design Open House Presentation
- 2024 Station plans d line final station plan
- September 2012 SW DEIS ch6
- September 2012 SW DEIS ch6 Transportation Effects
- June 2016 SW FEIS Comments GeneralPublic
- 2026 Transitways, existing and planned (the layer behind the Development Trends Along Transit reports): metadata
- September 2011 TransitwaysUserGuidesTransitwayStationsSupport-(1)
- July 2018 003 intro
- June 2012 006
- October 2012 006.2
- June 2012 050
- October 2012 087.2
- June 2012 134
- June 2012 144
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.