Draft EA Chapter 1: Purpose and Need (Gateway Corridor)
- Date
- 2017
- Kind
- Environmental document
- From
- Washington County / Metropolitan Council
- File
- PDF, 31 pages, 4.3 MB
- Published as
- ch-1-purpose-and-need.pdf
- Published at
- https://www.metrotransit.org/Data/Sites/1/media/about/improvements/gold-line/ch-1-purpose-and-need.pdf (gone from there)
- This copy
- from the Wayback Machine's capture of 2022-05-21
- SHA-256
- 8cb8883a9375549a30923552c639ce6d61ed73bd8988f66c10f74522797ddb6c
- Filed under
- Gateway Corridor
- Names these lines
- METRO Gold Line ×39, METRO Green Line ×9, Route 219 ×3, METRO Blue Line ×2, Route 80 ×2, METRO Red Line ×1, METRO Orange Line ×1, Northstar Commuter Rail ×1, Route 4 ×1, Route 355 ×1, Route 61 ×1