Facts
- Year opened
- 2025
- Length
- 10.5 mi
- Stations
- 17
- Operator
- Metro Transit
- Vehicle
- Placeholder local_bus vehicle (1-car consist)
Ridership
1,709 boardings on a weekday, counted at the stops in autumn 2025. The official weekday average for 2025 was 1,099 (part of the year).
The figures, year by year
| Year | Weekdays | Saturdays | Sundays | Rides in the year | |||
|---|---|---|---|---|---|---|---|
| Counted | Official | Counted | Official | Counted | Official | ||
| 2025 | 1,709 | 1,099* | 1,263 | 850* | 1,062 | 679* | 363,791 |
Counted: average boardings a day in the Met Council's autumn stop counts, added up over the line's stops. Shown for a year only when at least nine in ten of its stops were counted.
Official: the average for the whole year, and the rides in the year, from the Regional Route Performance Analysis, which is published for 2018, 2019 and 2022 onward.
The two are counted differently and do not match exactly: the stop counts leave out unusual days and cover the autumn only.
* The service ran, or changed, for only part of that year, so the average understates it.
METRO Gold Line
Placeholder page. Edit via the admin UI to add history, planning notes, photos, and analysis.
Currently a local bus route operated by Metro Transit.
Planning documents
- Gateway Corridor 229 I-94 East, METRO Gold Line, Gold Line Extension
Filed elsewhere in the library, the documents that name METRO Gold Line most:
- May 2021 EA Appendix E: Technical Reports Part 3
- 2021 Section 106 Assessment of Effects and Determination of Effect
- November 2015 2015 Legislative Report: Guideway Status (incl. NLX, Zip Rail, TCMC, Northstar)
- December 2023 East Metro Transit Network Opportunities final report
- 2021 Legislative report with TCMC Phase 1 study and Twin Cities-Milwaukee HSR sections
- September 2024 Network now report
- 2015 2040 Transportation Policy Plan (adopted Jan 2015)
- 2014 CTIB annual report to the Legislature (2014)