Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name METRO Gold Line
470 documents, those that name it most first. The line's own page
The first 300 are shown.
- October 2019 File 2 of 2 - Section 106 Documentation
- 2 April 2020 Federal Transit Administration - Finding of No Significant Impact
- 2014 Scoping Decision Document
- December 2016 LPA Selection Summary Report
- November 2020 Section 106 Assessment of Effects and Final Determination of Effect for Historic Properties (November 2020)
- October 2019 Physical and Environmental Resources
- September 2019 EA Appendix F: Environmental Assessment Worksheet
- September 2019 METRO Gold Line BRT Environmental Assessment / EAW
- October 2019 Community and Social Resources
- October 2019 Public and Agency Coordination
- September 2019 EA Appendix A Technical Report 2: Alternatives
- October 2019 Transportation Resources
- February 2013 Gateway Corridor Alternatives Analysis Final Report
- October 2019 Final Section 4(f) and 6(f) Evaluation
- June 2021 Section 106 Assessment of Effects - 60% Addendum (June 2021)
- 30 October 2018 Fall engagement summary public final
- 18 December 2020 Pr 60percent engagementsummary combined final.ada
- 13 May 2019 Stationdesignengagementsummary combined final
- 13 May 2019 Stationdesignengagementsummary combined final.ada
- 10 August 2020 EA/FONSI Environmental Re-evaluation
- 9 June 2020 Pr 30percent commentsummary combined final.ada
- 7 June 2018 MN CMC r01 final
- 2 May 2025 Draft 2050 TPP Amendment 1 public comment version
- September 2024 Network now report
- October 2019 Sources and References Cited
- September 2019 File 1 of 2 - Section 106 Programmatic Agreement - Draft
- 24 September 2018 Summer engagement summary public final
- March 2020 Metropolitan Council - Findings of Fact and Conclusions
- September 2019 EA Appendix A Technical Report 1: Purpose and Need
- 26 July 2018 MN gbrt cbac final
- 4 April 2019 MN CMC r01 00 final
- 2014 Gold Line environmental process page (Section 106 quarterly reports, EA, scoping)
- 23 June 2023 Packet eccbjune2023 r01.00 final
- 28 June 2018 MN gbrt cbac final
- 2017 Draft EA Chapter 1: Purpose and Need (Gateway Corridor)
- October 2019 Indirect Effects and Cumulative Impacts
- 4 October 2018 MN CMC r00 03 final
- December 2015 Adopted Gold Line Station Area Plans email
- May 2021 EA Appendix E: Technical Reports Part 3
- 2019 Gold Line Station Area Plans amended (reduced)
- March 2025 Appendix a route changes metrotransit 030925 reduced
- 15 December 2021 Gold Line BRT - FTA Environmental Re-Evaluation (December 2021)
- 2 August 2018 MN CMC r00 05final
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- October 2019 Cultural Resources
- 26 May 2016 Gateway Gold Line Bus Rapid Transit: A Closer Look at Health and Land Use - Technical Report
- 23 September 2022 Packet eccb r01.00
- April 2020 Pr gold line video hmoob transcript final ADA
- April 2020 Pr gold line video somali transcript final ADA
- 14 February 2019 MN CMC r00 03 final
- April 2020 Pr gold line video english transcript final ADA
- 2021 Section 106 Assessment of Effects and Determination of Effect
- 29 May 2018 Mm gbrt cbac final
- 6 September 2018 MN CMC r00 06 final
- 26 April 2018 Notes gbrt CMC r01 00
- 11 July 2022 Eccb agendapacket rev01.00
- September 2017 Environmental Impact Statement Termination Comment Summary
- November 2015 2015 Legislative Report: Guideway Status (incl. NLX, Zip Rail, TCMC, Northstar)
- 23 August 2018 MN gbrt cbac final
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- December 2023 East Metro Transit Network Opportunities final report
- 2024 Metropolitan Area Transit Finance Report
- 2018 Metropolitan Area Transit Finance Report
- 2022 Metropolitan Area Transit Finance Report
- 2 May 2019 MN gbrt CMC r01 00 final
- 2021 Legislative report with TCMC Phase 1 study and Twin Cities-Milwaukee HSR sections
- 2020 Metropolitan Area Transit Finance Report
- December 2020 Arterial BRT Corridor Concepts - December 2020
- October 2019 Financial Analysis
- 19 January 2024 Packet eccbjan2024 r00.00
- 23 April 2025 Packet gbrt eccb r00.00
- 2017 Eastern End Realignment technical memo
- 28 February 2019 MN gbrt cbac r00 02
- April 2025 Red Rock Corridor Commission Meeting Packet 04242025 web
- April 2020 Pr gold line video spanish transcript final ADA
- 2015 2040 Transportation Policy Plan (adopted Jan 2015)
- 1 November 2018 MN CMC final
- August 2024 Network now final report rsv
- September 2024 Network now report no appendicies small
- April 2020 Pr gold line video karen transcript final ADA
- April 2015 00 SIP FinalReport inclAppendices
- June 2019 2040 TPP Gold Line 1 94 Amendment
- 27 March 2024 Mp eccb packet r00.00 final
- January 2024 Red Rock Corridor Commission Meeting Packet 01312024
- August 2016 Red Rock Cost Estimation Technical Memorandum v5
- February 2024 A Vision for Serving and Connecting the Red Rock Corridor Vision Refresh Final Report 01312024
- 2014 CTIB annual report to the Legislature (2014)
- 28 August 2024 Packet eccb r00.00
- 18 December 2025 Packet eccb r01.00
- June 2020 Rush Line BRT Project Environmental Assessment_Appendix E Technical Reports Part 2
- 19 April 2024 Mp eccbpacket r00.00
- 10 May 2023 Packet eccbmay2023 r00.00
- 2014 View PDF
- 2013 CTIB annual report to the Legislature (2013)
- October 2024 Gold line extension fact sheet
- 1 October 2019 PR EAOpenHousesPoster Final ADA
- 3 June 2021 Presentation CMC r00 09final
- 20 February 2025 Presentation goldline CMC rev 00.00
- 2025 Transit Needs Study existing conditions report
- January 2019 GoldLineSAP
- 1 November 2018 Presentation CMC r00 07Final
- 7 June 2023 Fs gbrt what to expect 2023 r07 00 ADA
- 9 July 2018 Fs generalfactsheet final hmong.ada
- 9 July 2018 Fs generalfactsheet r04.ada
- 19 September 2019 Fs generalfactsheet R15
- 3 May 2018 Goldline factsheet
- September 2024 Network now report appendix a
- 7 October 2021 Presentation CMC rev00.02
- 4 October 2018 Presentation CMC rev00.18
- April 2018 Appendixc summary updatedimprovements
- 8 October 2025 Business Item 2025-229: 2050 TPP Amendment 1 (Blue Line Extension and Gold Line Extension)
- 29 July 2021 Fs general final .ada
- 29 July 2021 Fs general r17 00
- 27 February 2023 Fs general r21 00
- 9 April 2024 Fs general r22 00
- 30 January 2019 Fs generalfactsheet r05.ada
- 21 February 2024 Pr whattoexpect2024 r03 00
- 26 September 2019 Presentation CMC r00 03
- 6 September 2018 Presentation CMC rev00.00final
- 4 March 2024 277 gold line what to expect handout
- September 2021 B line final corridor plan
- February 2021 Draft corridor plan
- 19 September 2019 Fs eahandout R09
- 2022 Gold line fact sheet
- 26 October 2023 May-September 2023 Engagement Summary Report and Appendices
- 17 July 2018 Pr openhouseboards r04.ada
- June 2020 Section 106 Coordination (11 MB)
- 2024 What We Heard: Public Engagement Summary Report (EPE phase)
- 14 February 2019 CMC scopecostupdate rev03.00
- 2019 Gold Line EA and decision documents page
- August 2017 Memo: Environmental Impact Statement Termination Notification
- 28 June 2018 Presentation cbac r00 00
- 26 October 2018 Presentation cbac r00 02
- 23 August 2018 Presentation cbac r00 02
- 26 April 2018 Presentation CMC final
- 7 May 2020 Presentation CMC final
- 4 April 2019 Presentation CMC r07 00
- May 2021 Rush Line BRT Environmental Assessment
- 26 October 2022 0 RRCC Packet
- 19 March 2020 2020 2024 Transportation Improvement Program FINAL
- 2015 2040 TPP Chapter 6: Transit Investment Direction and Plan (v1.0)
- December 2013 Agenda
- March 2021 Architecture History / History Background Research Report (March 2021)
- 15 June 2026 Blue Line Extension Bus Rapid Transit Alternatives Analysis (legislative report)
- 9 July 2018 Fs generalfactsheet final karen.ada
- 2014 Gateway Corridor Project EIS tracker (status: cancelled)
- undated LRL research guide: Light Rail and Commuter Transit timeline (with call numbers)
- 9 October 2018 Meeting materials DT OH
- October 2013 Packet Addendum AAU Tech Memos 3 6
- April 2021 Visual Quality Manual, April 2021
- April 2022 2 Item 3 Meeting Minutes
- April 2018 Appendixe summary proposedimprovements
- April 2018 Appendixf resourceimpacts proposedimprovements
- 9 July 2018 Fs eahandout final hmong.ada
- September 2024 Meeting Minutes w attachments
- 28 February 2019 Presentation cbac Rev01
- September 2024 Red Rock Corridor Commission Meeting Packet 09302024 web
- August 2016 Red Rock Travel Demand Forecasting Report v6
- 26 October 2016 RRCC Packet
- May 2021 Section 4(f) Evaluation (13 MB)
- March 2015 07 AppendixF SIPImprovementsbyRt
- March 2015 08 AppendixG SIPImprovementsbyRegion
- March 2015 11 AppendixJ NewAnnualRidesandResources
- 2022 2026 TIP Final
- 14 October 2020 2040 TPP 2020 update: Chapter 6 Transit (TAB draft, Oct 2020)
- August 2019 Chapter 6 Transit Investment Direction and Plan
- 6 April 2022 Dbe mixer sign in sheet final
- 2025 Fall/Winter 2025 Engagement Summary
- 6 October 2021 Findings of Fact and Conclusions, October 2021
- 9 July 2018 Fs eahandout final spanish.ada
- 20 April 2022 Fs gbrt construction final .ada
- March 2016 Full Meeting Packet 32416
- 29 May 2020 Historic Context of the Riverview Modern Streetcar Corridor in Saint Paul, 1850-1980 (May 2020)
- 12 February 2025 Imagine 2050 Transportation Policy Plan: Transit Investment Plan (accessible PDF page)
- 29 May 2018 Presentation cbac r00 00
- 2 August 2018 Presentation CMC final
- 2 May 2019 Presentation CMC r05.00
- 23 April 2020 Presentation gbrt cbac sent
- April 2026 Red Rock Corridor Commission Meeting Packet 04302026
- October 2021 Rush Line BRT Finding of No Significant Impact
- 6 October 2021 Rush Line BRT FOFC FONSI
- 6 October 2021 Rush Line BRT FONSI
- January 2020 00 Red Rock Corridor Commission 01302020 Full Meeting Packet
- 28 March 2019 1 RRCC Agenda
- 3 June 2022 Comprehensive Plan Transportation chapter (adopted 2020, amended June 2022)
- May 2021 EA Appendix E: Technical Reports Part 1
- 26 September 2016 Final Report Red Rock low res
- October 2019 Final RRCC Meeting Minutes
- 20 July 2022 Gold Line BRT Section 106 Quarterly Report No. 10 (April 1 - June 30, 2022)
- 18 October 2022 Gold Line BRT Section 106 Quarterly Report No. 11 (July 1 - September 30, 2022)
- 6 January 2023 Gold Line BRT Section 106 Quarterly Report No. 12 (October 1 - December 31, 2022)
- 2021 Gold Line BRT Section 106 Quarterly Report No. 5 (January 1 - March 31, 2021)
- 2021 Gold Line BRT Section 106 Quarterly Report No. 6 (April 1 - June 30, 2021
- 2021 Gold Line BRT Section 106 Quarterly Report No. 7 (July 1 - September 30, 2021)
- 13 January 2022 Gold Line BRT Section 106 Quarterly Report No. 8 (October 1 - December 31, 2021)
- 2022 Gold Line BRT Section 106 Quarterly Report No. 9 (January 1 - March 31, 2022)
- May 2023 Meeting Minutes
- February 2021 Network Next: Identifying the Next Arterial BRT Lines (final report)
- 15 March 2017 Notice to Rescind the Notice of Intent to Prepare an Environmental Impact Statement
- 22 September 2016 Packet
- 7 June 2018 Presentation CMC r00 10
- August 2021 Public engagement summary (March 2018-May 2021)
- 15 August 2023 Red Rock Corridor Commission Meeting Packet
- December 2025 Red Rock Corridor Commission Meeting Packet 12162025
- 18 November 2016 Red Rock Corridor Implementation Plan presentation
- September 2016 Red Rock Implementation Plan Final Report DRAFT v4
- 29 January 2020 Rush Line BRT public engagement summary with appendices (Jan 2020)
- 2018 Rush Line Public Engagement Summary March to September
- April 2016 Southwest LRT FEIS Appendix M SDEIS Part 4
- April 2016 Southwest LRT FEIS AppM
- June 2021 11 08 209106 21 blinefactsheet
- 2024 2028 TIP
- June 2015 2040 TPP Chapter 4 Transportation Finance
- 23 April 2020 Ag gbrt cbac
- 6 November 2024 Ag gbrt CMC .pdf
- 20 February 2025 Ag gbrt CMC rv1
- 22 September 2015 Bus rapid transit projects move forward in the twin cities startribune
- 19 June 2019 Comprehensive Plan Transportation chapter (approved June 2019)
- October 2014 Draft SIP All
- May 2021 EA Appendix G: Environmental Assessment Worksheet
- March 2017 EastWestTransitFinalReport
- October 2014 executive summary
- 9 July 2018 Fs generalfactsheet final spanish.ada
- 19 February 2019 Fs ph2esa fieldwork final
- 16 March 2022 Gbrt dbemixerflyer r00 02 002
- March 2020 Gold Line BRT Section 106 Quarterly Report No. 1 (January 7 - March 31, 2020)
- June 2020 Gold Line BRT Section 106 Quarterly Report No. 2 (April 1 - June 30, 2020)
- 16 October 2020 Gold Line BRT Section 106 Quarterly Report No. 3 (July 1 - September 30, 2020)
- 2021 Gold Line BRT Section 106 Quarterly Report No. 4 (October 1 - December 31, 2020)
- 26 January 2018 Gold Line BRT- Rush Line BRT update to PC
- January 2024 Meeting Minutes w attachments
- February 2014 Notice of Intent to prepare an EIS for the Gateway Corridor (Federal Register)
- 24 April 2020 Pr 30 design presentation final ADA
- December 2017 Public Engagement Summary #5 with appendices (Aug-Nov 2017)
- August 2016 Red Rock Service Plan Technical Memorandum v4
- 6 June 2019 Reduced b line open house boards for web english
- April 2025 Regional Transportation Finance
- 19 October 2017 RRCC Packet
- 11 October 2024 Summary (CBAC)
- October 2014 Table2
- 2014 2040 Transportation Policy Plan (2014 public draft)
- 26 October 2016 7 Item 4b RRCC Minutes
- 25 October 2018 Ag gbrt cbac
- 29 May 2018 Ag gbrt cbac
- 17 August 2020 Ag gbrt cbac maplewood landfall oakdale woodbury
- 12 August 2020 Ag gbrt cbac stpaul
- 2 May 2019 Ag gbrt CMC
- 5 May 2022 Ag gbrt CMC
- 6 September 2018 Ag gbrt CMC final
- February 2013 Agenda
- January 2013 Agenda
- 2023 Annual Regional Park and Ride System Report
- April 2012 Arterial Transitway Corridors Study final report
- 28 October 2019 B line fact sheet
- July 2016 Bottineau LRT FEIS Chapter 07 Environmental Justice
- June 2019 Chapter 4 Transportation Finance
- 9 July 2018 Fs eahandout final karen.ada
- 20 May 2021 Gold Line BRT - FHWA Environmental Re-Evaluation (May 2021)
- June 2017 LPA Report Appendix A: LPA Overview
- February 2023 Meeting Minutes
- July 2016 METRO Blue Line LRT Extension Final EIS (full report)
- December 2022 Metro diagrammap vision
- 19 July 2023 Mm rms boards r07 compressed compressed
- 16 March 2022 Pl cbac application final
- 29 February 2024 Policy Advisory Committee meeting notes (Feb 29, 2024)
- 13 December 2023 Policy Advisory Committee meeting summary (Dec 13, 2023)
- 24 February 2022 Policy Advisory Committee presentation (Feb 24, 2022)
- 25 April 2019 Presentation cbac
- 28 April 2022 Purple line fact sheet
- July 2021 Purpose and Need Public Review Summary
- 26 October 2023 Red Rock Corridor Comission Meeting Packet
- 9 April 2023 Red Rock Corridor Commission Meeting Packet
- 2024 Riverview handout route maps (PDF)
- March 2014 RRCC Agenda Packet
- May 2016 RRCC Agenda Packet
- 12 December 2016 RRCC Packet
- September 2017 Rush Line Corridor Pre-Project Development Study: LPA Selection Report (final)
- March 2023 Southwest Light Rail Transit Construction: Metropolitan Council Decision Making
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 3
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 6
- August 2026 Sun Ray Transit Center
- March 2026 Sunraytransitcenter
- 2025 Transit Corridors & Studies index page
- 2026 Transitways, existing and planned (the layer behind the Development Trends Along Transit reports): metadata
- 21 April 2026 (April 21, 2026)
- 22 April 2026 (April 22, 2026)
- 27 April 2026 (April 27, 2026)
- 22 April 2026 (April 28, 2026)
- 28 April 2026 (April 28, 2026)
- August 2026 (August 24, 2026)
- 20 April 2022 000 RRCC Meeting Packet
- October 2021 02 Minutes
- March 2015 05 AppendixD SIP Outreach
- October 2019 1 RRCC Agenda 102419 Final
- 2019 2040 TPP overview, October 2018 update with 2019 amendments
- 2018 2040 Transportation Policy Plan Update Overvi
- 25 May 2017 3 Item 3b Meeting Minutes
- January 2018 4 Item 3b 8242017 RRCC Minutes
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.