EA Appendix A Technical Report 1: Purpose and Need
- Date
- September 2019
- Kind
- Environmental document
- From
- FTA / Metropolitan Council
- File
- PDF, 41 pages, 3.8 MB
- Published as
- for_web_metro_gold_line_brt_ea_appendix_a_tr1_purposeneed_final_ada.pdf
- Titled inside
- Metro Gold Line Bus Rapid Transit Environmental Assessment Appendix A: Purpose and Need
- Published at
- https://www.metrotransit.org/Data/Sites/1/media/about/improvements/gold-line/for_web_metro_gold_line_brt_ea_appendix_a_tr1_purposeneed_final_ada.pdf (gone from there)
- This copy
- from the Wayback Machine's capture of 2022-10-07
- SHA-256
- cf68b30fd19216352f2e8738fd52ecd5f587c8fcf0fb2592b874ab92ac326727
- Filed under
- Gateway Corridor
- Names these lines
- METRO Gold Line ×48, METRO Green Line ×7, METRO Blue Line ×3, Route 219 ×3, Route 80 ×2, METRO Red Line ×1, METRO Orange Line ×1, METRO A Line ×1, METRO C Line ×1, METRO D Line ×1, Northstar Commuter Rail ×1, Route 61 ×1