TRANSIT LIBRARY

A Vision for Serving and Connecting the Red Rock Corridor Vision Refresh Final Report 01312024

Open the PDF (6.3 MB)

Date
February 2024 (when the file was made; the document may be a little older)
Kind
Studies, plans and reports
From
Washington / Dakota / Ramsey Counties
File
PDF, 102 pages, 6.3 MB
Published as
A-Vision-for-Serving-and-Connecting-the-Red-Rock-Corridor_Vision-Refresh-Final-Report-01312024.pdf
Published at
https://redrockcorridor.com/wp-content/uploads/2024/02/A-Vision-for-Serving-and-Connecting-the-Red-Rock-Corridor_Vision-Refresh-Final-Report-01312024.pdf (still there when last looked)
This copy
from the site that published it
SHA-256
6f4d8950ac003b41a5d30b46eaf5f75bef4f73fd6526d0319b7ac25a4de7384b
Filed under
Red Rock Corridor
Names these lines
METRO Gold Line ×15, Route 363 ×1, METRO Green Line ×1, Northstar Commuter Rail ×1
♫ NOW PLAYING
No track loaded
0:00
🔊