CMC scopecostupdate rev03.00
- Date
- 14 February 2019
- Kind
- Meetings: agendas, presentations, minutes
- From
- Metro Transit
- File
- PDF, 29 pages, 2.4 MB
- Published as
- cmc_scopecostupdate__20190214_rev03.00.pdf
- Published at
- https://www.metrotransit.org/Data/Sites/1/media/about/improvements/gold-line/cmc_scopecostupdate__20190214_rev03.00.pdf
- This copy
- from the Wayback Machine's capture of 2024-03-29
- SHA-256
- 1766c010c305b901c7c2167564c033ca1313823e753cc8fb5aafd36ae54877e0
- Filed under
- Gateway Corridor
- Names these lines
- METRO Gold Line ×8, METRO C Line ×1