E line corridor study technical memo 1
- Date
- January 2021 (when the file was made; the document may be a little older)
- Kind
- Studies, plans and reports
- From
- Metro Transit
- File
- PDF, 37 pages, 8.9 MB
- Published as
- e-line-corridor-study-technical-memo-1.pdf
- Published at
- https://www.metrotransit.org/Data/Sites/1/media/e-line/e-line-corridor-study/e-line-corridor-study-technical-memo-1.pdf
- This copy
- from the Wayback Machine's capture of 2025-02-24
- SHA-256
- f13c04b17774f28fdf28088707e619a80200fd264bf0120fa4677eb3e4d0f889
- Filed under
- Hennepin Avenue Corridor
- Names these lines
- METRO E Line ×89, METRO Green Line ×7, Route 2 ×6, Route 17 ×6, Route 114 ×4, METRO A Line ×2, METRO C Line ×1