TRANSIT LIBRARY

Highway 169 Mobility Study Implementation Plan

Open the PDF (4.2 MB)

Date
April 2018
Kind
Implementation plan
From
SRF Consulting for MnDOT, Met Council, Scott County (City of Golden Valley copy)
File
PDF, 50 pages, 4.2 MB
Published as
Implementation-Plan-PDF
Published at
https://www.goldenvalleymn.gov/DocumentCenter/View/367/Implementation-Plan-PDF (still there when last looked)
This copy
from the site that published it
SHA-256
03dc0ef0ef21b62b4a04288acd57c0f641d21a5d4ef99ba3d905668cf94ffca9
Filed under
Highway 169 Corridor
Names these lines
METRO Green Line ×14, METRO C Line ×8, METRO Blue Line ×7, METRO Orange Line ×4, METRO D Line ×3, Northstar Commuter Rail ×2, Route 774 ×1, Route 46 ×1, Route 542 ×1, Route 615 ×1, Route 645 ×1
♫ NOW PLAYING
No track loaded
0:00
🔊