Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name METRO Blue Line
1,136 documents, those that name it most first. The line's own page
The first 300 are shown.
- September 2016 Appendices
- June 2024 BLE SDEIS Appendix A 4 Cultural Resources Docu-(1)
- June 2024 BLE SDEIS Appendix A 9 Agency Coordination and Eng
- December 2018 Tech memo (PDF)
- May 2025 Appendix A 4 Vol 2
- June 2024 BLE SDEIS Appendix A CR Preparation Notices Commen
- July 2016 Bottineau LRT FEIS Appendix G 00 through 05 Responses To DE
- May 2025 Responses to Comments on the Supplemental Draft Environmental Impact Statement
- June 2024 BLE SDEIS Appendix A 4 Archeological and Architect
- April 2020 Wayfinding report (PDF)
- July 2016 Bottineau LRT FEIS Appendix I Section 404 Coordination
- May 2025 Appendix A 4 Vol 1
- June 2022 Addendum Bottineau LRT Route Modification Report F
- July 2016 Bottineau LRT FEIS Appendix J Section 4(f) and 6(f) Support
- June 2024 BLE SDEIS Appendix A 5 Noise and Vibration Technic
- May 2016 Bottineau LRT FEIS Appendix H 4b Theo Wirth Cultural Landsc
- June 2024 BLE SDEIS Appendix A 5 Physical and Environmental
- July 2016 Bottineau LRT FEIS Appendix F 06 Wetlands Technical Report
- May 2025 Appendix A 4 Cultural Resources
- June 2024 Appendix A-9 Chapter 9: Agency Coordination
- 2007 Southwest Transitway Alternatives Analysis final report (HCRRA, 2007)
- February 2022 AppendixC_BLRT Public Engagement Report (Dec 2021 - Jan 2022)
- May 2025 Blue Line Extension Appendix A-8. Chapter 8: Draft Section 4(f) and 6(f) Evaluation
- May 2025 Appendix A 5 Noise and Vibration
- May 2025 Appendix A 4 Vol 4
- June 2024 BLE SDEIS Appendix A 3 Traffic and Aviation Docume
- June 2015 Station area plan (PDF 6MB)
- April 2015 Southwest LRT FEIS AppN
- May 2025 Blue Line Extension Chapter 5 Physical and Environmental Analysis
- August 2010 Hiawatha LRT Before and After Study (incl. 30-year planning history)
- June 2024 BLE SDEIS Chapter 5 Physical and Environmental Ana
- May 2025 Appendix A 3
- 2009 Southwest Transitway Scoping Summary Report (HCRRA, 2009)
- June 2015 Station area plan (PDF)
- 2021 Legislative report with TCMC Phase 1 study and Twin Cities-Milwaukee HSR sections
- 2020 Metropolitan Area Transit Finance Report
- June 2024 Supplemental Draft EIS: Appendix A-8, Supplemental Draft Section 4(f) Evaluation
- 2018 Metropolitan Area Transit Finance Report
- 2022 Metropolitan Area Transit Finance Report
- November 2015 2015 Legislative Report: Guideway Status (incl. NLX, Zip Rail, TCMC, Northstar)
- 2 May 2025 Draft 2050 TPP Amendment 1 public comment version
- July 2016 Bottineau LRT FEIS Appendix F 09 Biological Environment Tec
- 2020 Vision plan interactive (PDF 63MB)
- May 2025 Blue Line Extension Chapter 4 Community and Social Analysis
- November 2004 Hiawatha Light Rail Transit System Transportation & Maintenance Operations Plan
- June 2024 BLE SDEIS Chapter 7 Environmental Justice and Just
- June 2024 BLE SDEIS Appendix A 4 Community and Social Analys
- August 2012 SW DEIS appE
- August 2012 SW DEIS appE Agency Coordination
- May 2025 Blue Line Extension Chapter 3 Transportation
- August 2016 Bottineau LRT Final ROD Attachment B signed
- 15 June 2026 Blue Line Extension Bus Rapid Transit Alternatives Analysis (legislative report)
- June 2016 Bottineau LRT FEIS Appendix H 1 Section 106 Memorandum of A
- July 2017 Bottineau Corridor housing inventory (PDF 5MB)
- February 2018 Detailed Definition of Alternatives Report #7
- July 2017 Housing inventory (PDF)
- June 2016 Bottineau LRT FEIS Appendix H 3 Section 106 Consultation Me
- June 2024 BLE SDEIS A 3 Transportation
- 2023 Updated Crystal station area plan - 2023 (PDF)
- June 2024 BLE SDEIS Chapter 4 Community and Social Analysis
- May 2025 Blue Line Extension Appendix A-4. Appendix Chapter 4: Community and Social Analysis
- July 2016 METRO Blue Line LRT Extension Final EIS (full report)
- June 2016 Bottineau LRT FEIS Appendix F 10 Stormwater Management Plan
- 2023 Updated Robbinsdale station area plan - 2023 (PDF)
- May 2016 Bottineau LRT FEIS Appendix F 02 Traffic Operations Technic
- 2006 Southwest Transitway AA Tech Memo 3: Definition of alternatives (lists 1981-2003 predecessor studies)
- May 2025 Appendix A 5 Water Resources
- May 2025 Appendix A 4 Visual Quality
- 14 July 2021 Engagement Report
- August 2021 Advancing equity handout (PDF)
- June 2016 Bottineau LRT FEIS Appendix H 2 Section 106 Agency Correspo
- 2024 Metropolitan Area Transit Finance Report
- May 2025 Blue Line Extension Chapter 9 Consultation and Coordination
- January 2014 Midtown corridor operating plan
- April 2016 Southwest LRT FEIS AppM
- 2014 CTIB annual report to the Legislature (2014)
- June 2024 Supplemental Draft EIS: Chapter 1 Purpose and Need
- May 2025 Appendix A 5 Physical and Environmental
- June 2024 BLE SDEIS Chapter 3 Transportation
- June 2012 ConceptPlanReport
- 2025 Supplemental Final EIS: Chapter 1
- June 2024 BLE SDEIS Chapter 6 Indirect Impacts and Cumulativ
- November 2012 RecPlan.2
- May 2025 Blue Line Extension Chapter 6 Cumulative Potential Effects (per MN Rules § 4410), Reasonably Foreseeable Trends and Future Plans
- June 2016 Bottineau LRT FEIS Appendix D Agency Coordination
- May 2014 Bottineau LRT DEIS Comments CivicOrgs
- May 2014 Bottineau LRT FEIS Appendix G 08 DEIS Comments Civic Organi
- 2013 CTIB annual report to the Legislature (2013)
- February 2014 Finalcctransitstudyreportupdate
- December 2001 Hiawatha Avenue Light Rail Transit Line, December 31, 2001: Special Review
- May 2016 Bottineau LRT FEIS Appendix H 4a Section 106 Determination
- December 2021 JULY AUG Report
- September 2024 Network now report
- December 2018 Project summaries A-J (PDF)
- January 2016 000 recommended c line station plan complete
- March 2014 Bottineau Transitway Draft EIS
- August 2020 City projects (PDF)
- April 2016 Final C Line Station Plan
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 3
- 2015 2040 Transportation Policy Plan (adopted Jan 2015)
- June 2024 BLE SDEIS Chapter 9 Consultation and Coordination
- 1999 Final Hiawatha Corridor LRT Benefit-Cost Analysis (legislative report)
- June 2018 Housing gaps analysis (PDF)
- June 2024 Supplemental Draft EIS: Chapter 2 Alternatives (route modification after BNSF)
- 2025 Supplemental Final EIS: Executive Summary
- February 2015 Tracking the Blue Line Extension Issue 1-(February
- May 2016 Bottineau LRT FEIS Appendix F 07 Modified Phase I ESA
- September 2016 Bottineau LRT Final ROD Attachment D
- December 2002 Hiawatha Avenue Light Rail Transit Line, December 31, 2002: Special Review
- May 2024 Jan Engagement Report
- December 2023 Engagement Summary Sept
- December 2021 SEP Engagement
- May 2025 Appendix A 5 Biological Environment Technical Repo
- April 2020 Bottineau wayfinding project summaries (PDF)
- June 2024 Supplemental Draft EIS: Executive Summary
- March 2016 Tracking the Blue Line Extension Issue 5,-March 20
- November 2015 000 draft c line station plan complete
- February 2009 Appendix L
- June 2024 BLE SDEIS Appendix A 2 Alternatives Development Pr
- June 2024 BLE SDEIS Appendix A 4 Cultural Resources Technica
- May 2025 Blue Line Extension Chapter 2 Alternatives
- undated LRL research guide: Light Rail and Commuter Transit timeline (with call numbers)
- January 2022 Metro Blue Line Extension Light Rail Transit
- June 2009 Central Corridor LRT Final EIS: Chapter 2 Alternatives Considered
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- December 2017 Public Engagement Summary #5 with appendices (Aug-Nov 2017)
- December 2015 Tracking the Blue Line Extension Issue 4-(December
- March 2025 Appendix a route changes metrotransit 030925 reduced
- 2022 FallEngagementReport
- May 2015 Tracking the Blue Line Extension Issue 3
- September 2016 Bottineau LRT Final ROD Attachment C
- 13 February 2013 Midtown AA Tech Memo 2: Review and Summary of Previously Completed Work
- April 2022 Route Modification Report
- February 1985 TH 55 (Hiawatha Avenue) Final EIS / 4(f) Evaluation and Alternatives Analysis
- 14 January 2009 2030 Transportation Policy Plan (adopted Jan 14, 2009)
- 2014 2040 Transportation Policy Plan (2014 public draft)
- May 2025 Blue Line Extension Supplemental Final Environmental Impact Statement Appendix A-1 List of Preparers and List of Recipients
- May 2023 Jan Blue Line Round 7 Engagement Summary
- 14 October 2020 2040 TPP 2020 update: Chapter 6 Transit (TAB draft, Oct 2020)
- 1 August 2006 Access Minneapolis: Downtown Transit Circulation Concept final report
- May 2025 Appendix A 5 Biological Environment Documents
- June 2024 BLE SDEIS Appendix A 1 List of Preparers and Recip
- 2020 Bottineau LRT Project Facts
- August 2019 Chapter 6 Transit Investment Direction and Plan
- 2023 Community Engagement Framework English
- August 2016 Station area plan (PDF 6MB)
- October 2016 Tracking the Blue Line Extension Issue 7-(October
- January 2009 Appendix J 2
- August 2016 Bottineau LRT Final ROD Attachment E
- 16 April 2015 Memo 2 problem statement final
- 17 June 2013 Midtown aa tech memo 4 intial screen appendices tables only
- February 2021 Network Next: Identifying the Next Arterial BRT Lines (final report)
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 9
- 2007 Southwest Transitway AA final report Chapter 5: Alternatives (incl. heavy rail, PRT)
- July 2016 Station area plan (PDF 5MB)
- August 2023 Engagement Summary June
- April 1981 Hiawatha Avenue Corridor Light Rail Transit Feasibility Study
- May 2011 Regional Transitway Guidelines Technical Report
- October 2018 Shared mobility recommendations (PDF)
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 2
- April 2016 Southwest LRT FEIS Appendix M SDEIS Part 2
- October 2003 Southwest Rail Transit Study final report (HCRRA, 2003)
- July 2016 Station area plan (PDF 7MB)
- July 2015 Tracking the Blue Line Extension Issue 3-(July 201
- March 2017 Tracking the Blue Line Extension Issue 8-(March 20
- 8 August 2011 TSAAP RFP FINAL
- May 2025 Abbreviations and Glossary
- June 2024 BLE SDEIS Abbreviations and Glossary
- 2013 Central Corridor LRT environmental document (history of AA/DEIS, SDEIS, FEIS, infill stations EA)
- June 2009 Central Corridor LRT Final EIS: Chapter 6 Transportation Effects
- February 2017 Hwy169NTechMemoApp
- 12 February 2025 Imagine 2050 Transportation Policy Plan: Transit Investment Plan (accessible PDF page)
- November 2019 Wayfinding CE summary memo (PDF)
- November 2014 2030 Park and Ride Plan and Appendices
- 2015 Annual Regional Park and Ride System Report
- 2021 Annual Regional Park and Ride System Report
- February 2009 Appendix J 1
- July 2016 Bottineau LRT FEIS Appendix F 01 Transportation Technical R
- June 2016 Bottineau LRT FEIS Appendix F 05 Floodplain Technical Memo
- 2001 Cedar Avenue Corridor Transitway Study final report
- January 2013 Midtown corridor key issues memo
- March 2015 SPO StationArchitecture SC 19
- December 2017 Tracking the Blue Line Extension Issue 10-(Dec 20
- April 2012 Arterial Transitway Corridors Study final report
- 29 March 2024 Economic Development Analysis for the Riverview Transit Corridor (draft)
- February 2006 Full eas
- 16 July 2021 HennepinEngagmentReport
- 22 December 2005 Northstar Corridor Rail Project Environmental Assessment / Draft 4(f) Evaluation
- February 2018 Report #8: Riverview Corridor Pre-Project Development Study (final)
- April 2018 Tracking the Blue Line Extension Issue 11-(April 2
- 2024 What We Heard: Public Engagement Summary Report (EPE phase)
- 2015 2040 TPP Chapter 6: Transit Investment Direction and Plan (v1.0)
- March 2017 Bottineau LRT General Open House Boards
- May 2021 Complete recommended plan
- July 2018 Impact of the HEEC's work in the Ripple Effect Mapping report (PDF)
- 24 March 2015 Memo 1 relevant issues
- October 2016 Sec106 historic resources documentation
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 4
- April 2016 Southwest LRT FEIS Appendix M SDEIS Part 4
- April 2016 Southwest LRT FEIS Ch02
- November 2020 All TAP Phase III Comments
- December 2020 Arterial BRT Corridor Concepts - December 2020
- June 2024 BLE SDEIS Appendix A 5 Biological Environment Docu
- June 2024 BLE SDEIS Front Matter
- July 2016 Bottineau LRT FEIS Chapter 07 Environmental Justice
- December 2013 Bottineau LRT TechRept EconomicImpacts
- December 2013 Bottineau LRT TechRept NoiseAndVibration
- February 2017 Extending Tracks Issue 16
- September 2011 HiawathaLRTFacts pdf
- April 2013 Midtown corridor purpose and need full
- December 2017 Optimized Scenario Capital Costs and Concepts PDF
- February 2004 PlannedImprov
- April 2016 Southwest LRT FEIS Appendix M SDEIS Part 3
- 18 October 2023 SUM North Loop Community Meeting Summary
- May 2010 SW DEIS appH 1
- May 2010 SW DEIS appH 1 Supporting Technical Reports and Me
- July 2016 Tracking the Blue Line Extension,-Issue 6,-July 20
- July 2009 AA Tech Memo 6
- 2017 Annual Regional Park and Ride System Report
- March 2015 Annual Regional Park and Ride System Report
- May 2025 Blue Line Extension Chapter 11 Evaluation of Alternatives
- 8 October 2025 Business Item 2025-229: 2050 TPP Amendment 1 (Blue Line Extension and Gold Line Extension)
- October 2019 Chapter 2
- August 2020 Funding for types of real estate (PDF)
- February 2017 Getting From Here to There: Funding Transit in the Region
- August 2020 Northwest Crossing brand book (PDF)
- June 2023 Public Engagement Summary Report (Jan-June 2023)
- April 2020 Trifold single page draft (PDF)
- July 2009 AA Tech Memo 5
- May 2025 Appendix A 3 2
- 17 April 2024 BLE Minneapolis Boards
- June 2024 BLE SDEIS Chapter 11 Evaluation of Alternatives
- November 2018 Bottineau Corridor final report (PDF)
- 2015 C 23 Council m Travel Demand Methodology and F
- 2015 C 31 Council u Safety and Security Management
- 2015 C line planning phase outreach summary spring
- June 2009 Central Corridor LRT Final EIS: Executive Summary
- December 2020 Explore the evaluation results
- December 2007 Full Funding Grant Agreement
- 2024 Online open house boards: Streetcar benefits (Hwy 5 bridge, Bdote station)
- 2016 Park and Ride System Report
- August 2015 Southwest LRT FEIS AppG
- December 2018 Urban Land Institute Minnesota Technical Assistance Panel Report (PDF)
- April 2016 13 olson memorial highway stations final station plan
- 23 April 2024 BLE BrooklynPark Boards
- June 2024 BLE SDEIS Chapter 8 Summary of Supplemental Draft
- March 2021 Blue Line Extension Section 106 Quarterly Rep-(16)
- June 2021 Blue Line Extension Section 106 Quarterly Rep-(17)
- September 2021 Blue Line Extension Section 106 Quarterly Rep-(18)
- March 2022 Blue Line Extension Section 106 Quarterly Rep-(19)
- December 2021 Blue Line Extension Section 106 Quarterly Rep-(20)
- June 2022 Blue Line Extension Section 106 Quarterly Rep-(21)
- September 2022 Blue Line Extension Section 106 Quarterly Rep-(22)
- November 2016 Bottineau LRT Brooklyn Park Open House Boards
- February 2016 Bottineau LRT FEIS Appendix F 11 Financial Analysis Technic
- July 2016 Bottineau LRT FEIS Chapter 03 Transportation
- July 2016 Bottineau LRT Final EIS Notice of Availability
- September 2016 Bottineau LRT Final ROD Attachment F
- 2015 C 11 Council a Communications and Public Invol
- August 2013 Central Corridor Amended ROD, Attachment E: 2009 FEIS response to comments
- June 2013 Central Corridor Supplemental Final EIS: construction impacts on business revenue
- October 2009 City Mpls Nbhd Comm OrgsUpdated 2009106
- 7 March 2024 Crystal open house boards
- 11 November 2015 Economic development impacts of transit
- September 2009 LPA TM5 Transit Service DRAFT 090909
- December 2015 METRO Blue Line Extension Municipal Consent Guide
- 18 April 2012 Midtown Corridor AA scope of work
- 2014 Midtown Corridor Alternatives Analysis final report
- April 2014 Midtown corridor final report low res
- July 2013 Midtown corridor initial screening memo
- 2002 Northstar Corridor Record of Decision (references 1998-1999 studies, 2000 DEIS, 2002 FEIS)
- 2010 ParkRideSurveyReport pdf
- 26 January 2018 Planning Commission Riverview LPA packet (Jan 26, 2018)
- May 2025 Riverview Modern Streetcar Station Area Plans
- April 2001 Single track vintage trolley study
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 5
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 7
- May 2025 Table of Contents
- July 2017 Tracking the Blue Line Extension,-Issue 9-(July 20
- 15 April 2015 West broadway memo 3 conceptdevelopmentofalternatives final
- 15 December 2004 2030 Transportation Policy Plan (adopted Dec 15, 2004)
- 31 March 2015 A Line FINAL DCE Complete
- January 2009 Appendix B
- February 2009 Appendix M
- 2022 Blue Line Extension environmental page (Supplemental EIS notice, scope)
- December 2018 Blue Line Extension Section 106 Quarterly Repo-(7)
- November 2016 Bottineau LRT Minneapolis Open House Boards
- December 2013 Bottineau LRT TechRept Transportation
- December 2013 Bottineau Transitway Health Impact Assessment – final report (PDF)
- 2015 C 15 Council e Bus Transit Operations Plan Tec
- October 2019 Chapter 1
- February 2017 Full recommended plan appendices
- October 2013 Midtown AA Detailed Definition of Alternatives
- 21 October 2021 Policy Advisory Committee meeting summary (Oct 21, 2021)
- 2021 Public Engagement Summary Report #1 (Sept 2020-June 2021)
- August 2004 Rail Feasibility Study Chapter 4 Technologies
- July 2016 Record of Decision, Southwest LRT
- April 2016 Southwest LRT FEIS Ch03
- July 2016 Southwest LRT Record of Decision-( )
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.