Optimized Scenario Capital Costs and Concepts PDF
- Date
- December 2017 (when the file was made; the document may be a little older)
- Kind
- Maps, figures and drawings
- From
- MnDOT / Scott County
- File
- PDF, 60 pages, 17 MB
- Published as
- Optimized-Scenario-Capital-Costs-and-Concepts-PDF
- Published at
- https://goldenvalleymn.gov/DocumentCenter/View/372/Optimized-Scenario-Capital-Costs-and-Concepts-PDF (still there when last looked)
- This copy
- from the site that published it
- SHA-256
- de405ef5fe501acb8b3661e02c054d4442186dbae890d841b4202d3c604d167b
- Filed under
- Highway 169 Corridor
- Names these lines
- METRO Blue Line ×12, METRO C Line ×10, METRO Green Line ×3, METRO D Line ×2