Dan Patch Corridor Commuter Rail Feasibility Study
- Date
- July 2017 (when the file was made; the document may be a little older)
- Kind
- Studies, plans and reports
- File
- PDF, 174 pages, 97 MB
- Published as
- oclc466400167.pdf
- Published at
- https://www.leg.state.mn.us/docs/NonMNpub/oclc466400167.pdf (still there when last looked)
- This copy
- from the site that published it
- SHA-256
- d85084cc048ac44d08d23fa0b2fa1ebcf78092676a289afb662a21412e5051f0
- Filed under
- Archives, catalogues and research guides
- Names these lines
- Northstar Commuter Rail ×12, METRO Blue Line ×4, METRO Green Line ×3, METRO Red Line ×1, Route 9 ×1, Route 540 ×1