Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name METRO Red Line
285 documents, those that name it most first. The line's own page
- December 2015 Cedar Avenue Transitway Implementation Plan Update: final report
- June 2024 BLE SDEIS Appendix A 4 Cultural Resources Docu-(1)
- November 2009 Cedar Avenue Corridor Transitway Environmental Assessment Update (138th St to CH 70)
- 2018 Metropolitan Area Transit Finance Report
- 2008 Dakota County 2030 Transportation Plan (incl. 'New Mississippi River Crossing' section)
- 2021 Legislative report with TCMC Phase 1 study and Twin Cities-Milwaukee HSR sections
- 2020 Metropolitan Area Transit Finance Report
- 2022 Metropolitan Area Transit Finance Report
- 2014 CTIB annual report to the Legislature (2014)
- 2015 2040 Transportation Policy Plan (adopted Jan 2015)
- 2013 CTIB annual report to the Legislature (2013)
- November 2015 2015 Legislative Report: Guideway Status (incl. NLX, Zip Rail, TCMC, Northstar)
- 2012 2016 Regional Service Improvement Plan-(RSIP)
- 2001 Cedar Avenue Corridor Transitway Study final report
- 2014 2040 Transportation Policy Plan (2014 public draft)
- 2015 2040 TPP Chapter 6: Transit Investment Direction and Plan (v1.0)
- March 2017 EastWestTransitFinalReport
- 2014 Highway Transitway Corridor Study Tech Memo 2
- August 2019 Chapter 6 Transit Investment Direction and Plan
- May 2011 Regional Transitway Guidelines Technical Report
- September 2024 Network now report
- 2015 Annual Regional Park and Ride System Report
- May 2013 Red line how to
- March 2014 RRCC Agenda Packet
- 14 October 2020 2040 TPP 2020 update: Chapter 6 Transit (TAB draft, Oct 2020)
- 2013 Central Corridor LRT environmental document (history of AA/DEIS, SDEIS, FEIS, infill stations EA)
- May 2014 Highway Transitway Corridor Study Tech Memo 3: Corridor concepts and evaluation
- undated METRO Red Line – Cedar Avenue
- 2016 Park and Ride System Report
- 26 October 2016 RRCC Packet
- 2014 7 13 RRC Meeting Minutes Notes
- December 2013 Agenda
- 2017 Annual Regional Park and Ride System Report
- March 2014 Bottineau Transitway Draft EIS
- 2020 Cedar Avenue transitway: service (the county's old site)
- 2024 Metropolitan Area Transit Finance Report
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- 2018 TPP Update Public Comment Report
- 2015 7 23 RRCC Agenda
- March 2025 Appendix a route changes metrotransit 030925 reduced
- May 2012 Bottineau LRT Scop Decision App B
- 30 April 2013 Draft orange line project plan web version
- April 2014 METRO Orange Line BRT Project Plan Update (draft 2.0)
- 31 March 2014 Orange line TAC meeting 4
- 18 November 2016 Red Rock Corridor Implementation Plan presentation
- November 2014 2030 Park and Ride Plan and Appendices
- 2019 2040 TPP overview, October 2018 update with 2019 amendments
- 2018 2040 Transportation Policy Plan Update Overvi
- August 2013 Agenda
- January 2011 Cedar Avenue BRT fact sheet
- 26 September 2016 Final Report Red Rock low res
- 12 February 2025 Imagine 2050 Transportation Policy Plan: Transit Investment Plan (accessible PDF page)
- July 2016 METRO Blue Line LRT Extension Final EIS (full report)
- 22 September 2016 Packet
- September 2016 Red Rock Implementation Plan Final Report DRAFT v4
- June 2022 Addendum Bottineau LRT Route Modification Report F
- October 2013 Agenda
- September 2016 Appendices
- April 2012 Arterial Transitway Corridors Study final report
- June 2024 BLE SDEIS Appendix A 9 Agency Coordination and Eng
- December 2011 Bottineau LRT Scop Booklet
- July 2012 Bottineau LRT TechRept Transit Operations Plans
- 17 June 2013 Draft orange line project plan web version
- 9 July 2013 Final orange line project plan web version
- May 2014 Highway Transitway Corridor Study final report
- May 2014 HTCSFinal
- 23 July 2015 Item 3b RRCC Minutes
- 28 July 2015 Orange line DCRRA update
- May 2015 Red Rock Previously Completed Work Memo
- 22 October 2015 RRCC Packet
- April 2016 Southwest LRT FEIS Ch01
- April 2016 Southwest LRT FEIS Ch02
- May 2015 Southwest LRT SDEIS Signature Page,-Abstract,-Table of Con
- 2007 Southwest Transitway Alternatives Analysis final report (HCRRA, 2007)
- 2024 What We Heard: Public Engagement Summary Report (EPE phase)
- May 2013 Alternative analysis summary report (PDF)
- July 2016 Bottineau LRT FEIS Chapter 07 Environmental Justice
- July 2009 DraftTechMemo3
- 2009 Evaluation TransitEvalFullReport pdf
- February 2017 Getting From Here to There: Funding Transit in the Region
- 25 August 2015 Orange line DCRRA
- 30 August 2013 Orange line pep v3
- May 2016 RRCC Agenda Packet
- 29 August 2013 RRCC Minutes
- 28 January 2016 RRCC Packet
- 2019 Transit System Performance Evaluation
- April 2015 00 SIP FinalReport inclAppendices
- 14 January 2009 2030 Transportation Policy Plan (adopted Jan 14, 2009)
- June 2015 2040 TPP Chapter 4 Transportation Finance
- 2014 3 26 RRCC Minutes
- 2014 8 28 Meeting Minutes Notes
- May 2013 Agenda
- 15 June 2014 All olppu public comments
- May 2025 Appendix A 4 Cultural Resources
- 6 January 2014 BoardsCombined rev02 small
- August 2014 Bottineau LRT DEIS App H PublicNotices
- May 2014 Bottineau LRT DEIS Comments CivicOrgs
- May 2014 Bottineau LRT FEIS Appendix G 08 DEIS Comments Civic Organi
- March 2017 Bottineau LRT General Open House Boards
- June 2012 Bottineau LRT Scop Decision
- November 2016 Bottineau LRT Station Design Open Houses General Project Bo
- 2015 Cedar Avenue transitway: project history (the county's old site)
- October 2023 Chapter2 networkperformanceandopportunities 100423
- February 2018 Detailed Definition of Alternatives Report #7
- June 2025 Engagement report
- 2017 Highway 169 Mobility Study capital costs memo
- June 2014 HTCSTechMemo1
- 20 November 2013 Input wanted for proposed orange line BRT the drive startribune
- undated LRL research guide: Light Rail and Commuter Transit timeline (with call numbers)
- September 2013 Meetingpacket 19 FINAL
- December 2022 Metro diagrammap vision
- October 2014 October Commission Packet
- 18 September 2013 Orange line intro bloomington chamber
- 30 April 2014 Orange line plans ready for comment fc
- October 2013 Packet Addendum AAU Tech Memos 3 6
- June 2023 Public Engagement Summary Report (Jan-June 2023)
- August 2011 Red Rock Corridor Agenda
- 2024 Riverview handout route maps (PDF)
- May 2014 RRCC Agenda Packet
- 2014 Scoping Decision Document
- April 2015 SIP FinalReport Ch03
- 31 May 2013 Snelling BRT SPOC 1 presentation
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 3
- April 2015 Southwest LRT FEIS AppN
- May 2016 Southwest LRT Final EIS: front matter / table of contents
- April 2015 Southwest LRT SDEIS Appendix E Agency Coordination Letters
- 2006 Southwest Transitway AA Tech Memo 3: Definition of alternatives (lists 1981-2003 predecessor studies)
- April 2015 Station Design Open House Presentation
- February 2015 Tracking the Blue Line Extension Issue 1-(February
- November 2015 Transitway Stations Planning Status for Local Comp
- October 2019 Transportation Resources
- July 2018 003 intro
- 2018 01 d line fact sheet
- 2018 02 draft d line station plan complete document
- July 2015 05.28
- March 2021 11 02 183705 21 d line factsheet
- 15 December 2004 2030 Transportation Policy Plan (adopted Dec 15, 2004)
- August 2008 2030transitmasterstudy
- 2014 7 31 RRCC Workshop Agenda
- 26 October 2016 7 Item 4b RRCC Minutes
- July 2009 AA Tech Memo 5
- August 2021 Advancing equity handout (PDF)
- April 2012 Agenda
- February 2012 Agenda
- May 2015 Agenda Packet
- November 2020 All TAP Phase III Comments
- 2020 Annual Park and Ride System Report
- 2024 Annual Park and Ride System Report
- 2021 Annual Regional Park and Ride System Report
- June 2024 Appendix A-9 Chapter 9: Agency Coordination
- June 2019 Appendix C Long Range Highway and Transit Capital
- November 2017 Appendixb map implementedimprovements
- July 2016 Blue Line Extension Final EIS Chapter 1: Purpose and Need
- November 2018 Bottineau Corridor final report (PDF)
- March 2014 Bottineau Draft EIS Chapter 3: Transportation analysis
- March 2014 Bottineau Draft EIS: cover, abstract and contents (Met Council copy)
- August 2014 Bottineau LRT DEIS Ch01 PurposeAndNeed
- August 2014 Bottineau LRT DEIS Ch02 Alternatives
- August 2014 Bottineau LRT DEIS Ch07 EnvironmentalJustice
- July 2016 Bottineau LRT FEIS Appendix G 00 through 05 Responses To DE
- July 2016 Bottineau LRT FEIS Appendix J Section 4(f) and 6(f) Support
- July 2016 Bottineau LRT FEIS Chapter 04 Community and Social Analysis
- 22 September 2015 Bus rapid transit projects move forward in the twin cities startribune
- 2015 C 11 Council a Communications and Public Invol
- 2015 C 15 Council e Bus Transit Operations Plan Tec
- June 2009 Central Corridor LRT Final EIS: Chapter 1 Purpose and Need
- January 2014 Ch 1 introduction.ashx
- January 2014 Ch 20 glossary
- June 2019 Chapter 3 Land Use and Local Planning
- June 2019 Chapter 4 Transportation Finance
- 2023 Community Engagement Framework English
- 2023 Community Engagement Framework Spanish
- May 2021 Complete recommended plan
- 7 March 2024 Crystal open house boards
- 22 July 2022 D line 2022 title vi service equity analysis report
- 13 November 2019 D line fact sheet
- 14 March 2019 D line fact sheet
- June 2018 D line final station plan
- 2026 Dakota County Red Rock Corridor page
- July 2017 Dan Patch Corridor Commuter Rail Feasibility Study
- 2017 Draft EA Chapter 1: Purpose and Need (Gateway Corridor)
- January 2019 E line corridor survey responses
- September 2019 EA Appendix A Technical Report 1: Purpose and Need
- 29 March 2024 Economic Development Analysis for the Riverview Transit Corridor (draft)
- 11 November 2015 Economic development impacts of transit
- March 2013 Extending Tracks
- 14 November 2022 F line dcp fridley city council
- 15 November 2022 F line draft corridor plan open house
- 15 November 2022 F Line Draft Corridor Plan Virtual Open House (Nov. 15, 2022)
- 6 October 2021 Findings of Fact and Conclusions, October 2021
- February 2013 Gateway Corridor Alternatives Analysis Final Report
- 2026 Hennepin County transit page (funded transitways, under-study corridors)
- February 2015 Highway 55 final report addendum
- February 2017 Hwy169NTechMemoApp
- 7 July 2011 INTRO
- 22 February 2012 LANGDON .compressed
- June 2017 LPA Report Appendix A: LPA Overview
- May 2017 LPA Report Appendix B: Public Engagement Summary #4 (draft LPA)
- February 2012 Meeting Minutes
- May 2013 Meeting Minutes
- September 2019 METRO Gold Line BRT Environmental Assessment / EAW
- 13 December 2013 METRO Orange Line Existing Conditions Report (draft 4.0)
- undated METRO Orange Line – Interstate 35W
- 4 October 2018 MN CMC r00 03 final
- 2 May 2019 MN gbrt CMC r01 00 final
- January 2021 Molconnectingroutes 536 537 539
- January 2021 Molconnectingroutes 540 542
- January 2021 Molconnectingroutes 7 515
- September 2023 Network Now Chapter 1: Regional policy guidance (draft)
- August 2024 Network now final report rsv
- September 2024 Network now report appendix a
- September 2024 Network now report appendix b
- September 2024 Network now report no appendicies small
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- May 2012 OpenHouse
- 16 May 2013 Orange line bloomington
- 21 November 2014 Orange line BRT wins federal approval finance and commerce
- 25 March 2014 Orange line DCRRA
- 9 December 2015 Orange Line Extension plan
- 2 May 2013 Orange line vision coming into focus
- 10 June 2009 PAC Minutes
- 3 October 2013 Plans to upgrade 35w494 interchange,-add transit,-subject of open house star tribune
- 7 May 2020 Presentation CMC final
- 1 November 2018 Presentation CMC r00 07Final
- 2 May 2019 Presentation CMC r05.00
- July 2012 Program of Projects Workshop Presentation
- December 2017 Public Engagement Summary #5 with appendices (Aug-Nov 2017)
- August 2004 Rail Feasibility Study Chapter 5 Evaluation
- May 2021 Recommended plan appendix a
- undated Red Rock Corridor
- March 2015 Red Rock March Packet
- August 2016 Red Rock Travel Demand Forecasting Report v6
- 16 May 2018 Rev recommended d line station plan final
- undated Robert Street Corridor
- 2007 Robert Street transitway / METRO G Line page
- 26 March 2015 RRCC minutes
- 31 October 2013 RRCC Minutes
- 12 December 2016 RRCC Packet
- October 2021 Rush Line BRT Finding of No Significant Impact
- 6 October 2021 Rush Line BRT FOFC FONSI
- 6 October 2021 Rush Line BRT FONSI
- November 2013 SIP presentation
- 15 May 2013 Snelling BRT CAC 1 presentation
- 13 May 2013 Snelling BRT TAC 1 presentation
- 18 July 2013 Snelling open house 1 summary
- December 2016 Southwest LRT Contracting Open House Presentation-(Dec 5
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 9
- April 2016 Southwest LRT FEIS Appendix M SDEIS Part 4
- August 2015 Southwest LRT FEIS AppG
- September 2015 Southwest LRT FEIS AppJ
- April 2016 Southwest LRT FEIS AppM
- April 2016 Southwest LRT FEIS Ch03
- April 2016 Southwest LRT FEIS Ch04
- May 2016 Southwest LRT Final EIS: Executive Summary
- May 2015 Southwest LRT SDEIS Appendix J Visual Resources Technical
- May 2015 Southwest LRT SDEIS Executive Summary
- October 2003 Southwest Rail Transit Study final report (HCRRA, 2003)
- 2007 Southwest Transitway AA final report Chapter 5: Alternatives (incl. heavy rail, PRT)
- March 2016 Station and Support Facility Design Guidelines Use
- 7 March 2024 Summary (CMC)
- June 2024 Supplemental Draft EIS: Chapter 1 Purpose and Need
- 2025 Supplemental Final EIS: Chapter 1
- 6 May 2015 TAC orange line update
- December 2017 Tracking the Blue Line Extension Issue 10-(Dec 20
- April 2018 Tracking the Blue Line Extension Issue 11-(April 2
- May 2015 Tracking the Blue Line Extension Issue 3
- July 2015 Tracking the Blue Line Extension Issue 3-(July 201
- December 2015 Tracking the Blue Line Extension Issue 4-(December
- March 2016 Tracking the Blue Line Extension Issue 5,-March 20
- October 2016 Tracking the Blue Line Extension Issue 7-(October
- March 2017 Tracking the Blue Line Extension Issue 8-(March 20
- July 2016 Tracking the Blue Line Extension,-Issue 6,-July 20
- July 2017 Tracking the Blue Line Extension,-Issue 9-(July 20
- January 2018 Traffic Operations and Ridership PDF
- undated Transit
- undated Transit Providers and Partners
- September 2011 TransitwaysUserGuidesTransitwayStationsSupport-(1)
- April 2020 Trifold single page draft (PDF)
- 8 August 2011 TSAAP RFP FINAL
- 27 September 2023 Upcoming b line and e line ifbs and dbe info session
- December 2018 Urban Land Institute Minnesota Technical Assistance Panel Report (PDF)
- 2020 Vision plan interactive (PDF 63MB)
- 14 November 2022 Fridley City Council Conference Meeting (Nov. 14, 2022)
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.