Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Route 4
90 documents, those that name it most first. The line's own page
- June 2024 Bbr4 engagement summary
- April 2015 00 SIP FinalReport inclAppendices
- December 2020 Arterial BRT Corridor Concepts - December 2020
- February 2021 Network Next: Identifying the Next Arterial BRT Lines (final report)
- 2007 Southwest Transitway Alternatives Analysis final report (HCRRA, 2007)
- February 2024 08 02 611013 24 rt4factsheet
- March 2015 08 AppendixG SIPImprovementsbyRegion
- May 2021 Complete recommended plan
- January 2021 Concept plan full reportfinal
- February 2021 Johnson/Lyndale
- September 2024 Network now report
- 9 May 2023 E line preliminary design open house rev 1 1
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- February 2004 PlannedImprov
- August 2025 Transit Priority Implementation Workplan
- March 2015 07 AppendixF SIPImprovementsbyRt
- July 2009 AA Tech Memo 5
- March 2025 Appendix a route changes metrotransit 030925 reduced
- April 2018 Appendixe summary proposedimprovements
- September 2021 Eline draftcorridorplan
- May 2022 Eline finalcorridorplan
- March 2022 ELine RecommendedCorridorPlan Final
- January 2021 Ol connectingbus report
- May 2021 Recommended plan report
- 2006 Southwest Transitway AA Tech Memo 3: Definition of alternatives (lists 1981-2003 predecessor studies)
- December 2020 Explore the evaluation results
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- January 2021 Ol connectingbus execsummary
- February 2024 08 01 635584 24 forweb
- March 2015 11 AppendixJ NewAnnualRidesandResources
- May 2010 156map
- August 2010 156MAPfinal
- August 2010 579MAPfinal
- November 2020 All TAP Phase III Comments
- April 2018 Appendixf resourceimpacts proposedimprovements
- 19 February 2021 Arterial BRT Corridor Evaluation and Prioritization: Ridership Forecasts - February 2021
- October 2019 Chapter 2
- June 2025 Engagement report
- August 2023 Final Corridor Plan (Aug. 9, 2023)
- August 2024 Listofroute4changes
- 10 November 2020 Network Next proposed BRT corridors: community engagement summary
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 6
- February 2021 summary of engagement results
- 16 April 2022 Village lofts
- October 2022 Draft Corridor Plan (Oct. 24, 2022)
- April 2023 Recommended Corridor Plan (April 12, 2023)
- August 2026 (August 24, 2026)
- 2020 0113 14 summary of public comments
- March 2015 05 AppendixD SIP Outreach
- 2012 2016 Regional Service Improvement Plan-(RSIP)
- 2015 2040 Transportation Policy Plan (adopted Jan 2015)
- February 2009 Appendix L
- 2019 Arterial BRT planning process page (Network Next engagement summary and final technical report)
- October 2023 Chapter2 networkperformanceandopportunities 100423
- 2017 Draft EA Chapter 1: Purpose and Need (Gateway Corridor)
- October 2014 Draft SIP All
- January 2021 E line corridor study apendices compressed
- January 2019 E line corridor survey responses
- March 2013 ExecSummary
- October 2014 executive summary
- 17 November 2022 F line dcp nicollet island east bank na
- July 2002 F:\Projects\Minneapolis Sector 5\Route_Profiles\m4_40x28.prn
- July 2002 F:\Projects\Minneapolis Sector 5\Route_Profiles\m547_40x28.prn
- 23 March 2026 H line draft corridor plan
- March 2026 H line draft corridor plan updated
- September 2009 LPA TM5 Transit Service DRAFT 090909
- 23 March 2026 March 23, 2026
- September 2024 Meeting Minutes w attachments
- 16 April 2015 Memo 2 problem statement final
- 13 February 2013 Midtown AA Tech Memo 2: Review and Summary of Previously Completed Work
- 18 April 2012 Midtown Corridor AA scope of work
- January 2013 Midtown corridor key issues memo
- April 2013 Midtown corridor purpose and need full
- September 2024 Network now report appendix a
- September 2024 Network now report appendix b
- November 2020 Nn phase1 engagementppt
- October 2013 Packet Addendum AAU Tech Memos 3 6
- 10 September 2026 Recommended Corridor Plan
- September 2024 Red Rock Corridor Commission Meeting Packet 09302024 web
- 2023 Regional Route Performance Analysis for
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 7
- 2009 Southwest Transitway Scoping Summary Report (HCRRA, 2009)
- October 2014 Table2
- June 2025 Tech memo 1 candidate corridor identification
- July 2025 Tech Memo 2: Candidate corridor screening results
- March 2026 Washhennepin
- August 2026 Washington & Hennepin
- 17 November 2022 Nicollet Island-East Bank Neighborhood Association (Nov. 17, 2022)
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.