TRANSIT LIBRARY

Tech Memo 2: Candidate corridor screening results

Open the PDF (935 KB)

Date
July 2025
Kind
Technical memo
From
Metro Transit
File
PDF, 22 pages, 935 KB
Published as
tech-memo_screening-report_final.pdf
Titled inside
ABRT Plan Update – Screening Methodology & Results
Published at
https://www.metrotransit.org/Data/Sites/1/media/abrt/tech-memo_screening-report_final.pdf (gone from there)
This copy
from the Wayback Machine's capture of 2025-10-15
SHA-256
932688265ddd1630227b3e94a90b35b44526de5369c85baf5b3293dc6001869f
Filed under
The arterial BRT program
Names these lines
Route 38 ×1, Route 4 ×1, Route 46 ×1, Route 724 ×1, Route 515 ×1, Route 22 ×1, Route 14 ×1, Route 30 ×1, Route 219 ×1, Route 323 ×1, Route 223 ×1, Route 65 ×1, Route 2 ×1, Route 63 ×1, Route 61 ×1, Route 32 ×1, Route 18 ×1, Route 225 ×1, Route 64 ×1, Route 74 ×1
♫ NOW PLAYING
No track loaded
0:00
🔊