Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Route 2
99 documents, those that name it most first. The line's own page
- March 2012 ExistingConditionsReport
- June 2012 ConceptPlanReport
- February 2014 Finalcctransitstudyreportupdate
- November 2012 RecPlan.2
- February 2012 Appendix
- 31 March 2023 Northstar Rail Corridor Post-Pandemic Study final report
- 2007 Southwest Transitway Alternatives Analysis final report (HCRRA, 2007)
- June 2012 002
- October 2012 002.2
- 2012 2016 Regional Service Improvement Plan-(RSIP)
- January 2021 E line corridor study technical memo 1
- August 2020 Learn more about the screening process
- February 2021 Network Next: Identifying the Next Arterial BRT Lines (final report)
- September 2024 Network now report
- April 2015 00 SIP FinalReport inclAppendices
- July 2009 AA Tech Memo 5
- September 2021 Eline draftcorridorplan
- May 2022 Eline finalcorridorplan
- March 2022 ELine RecommendedCorridorPlan Final
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- 28 January 2016 RRCC Packet
- April 2016 Southwest LRT FEIS Appendix L DEIS Part 2
- 2006 Southwest Transitway AA Tech Memo 3: Definition of alternatives (lists 1981-2003 predecessor studies)
- March 2015 05 AppendixD SIP Outreach
- March 2025 Appendix a route changes metrotransit 030925 reduced
- March 2012 Chapter1IntroductionPurposeScope
- June 2012 Chapter4SImprovements
- January 2013 SW DEIS Cmt Agencies 1
- August 2025 Transit Priority Implementation Workplan
- 29 March 2022 Uofm
- August 2026 (August 24, 2026)
- November 2012 Ch4
- August 2023 Final Corridor Plan (Aug. 9, 2023)
- 23 March 2026 H line draft corridor plan
- March 2026 H line draft corridor plan updated
- 23 March 2026 March 23, 2026
- February 2004 PlannedImprov
- May 2012 Presentation
- July 2012 Publicinvolvementreport
- 10 September 2026 Recommended Corridor Plan
- April 2015 SIP FinalReport Ch04
- 16 April 2022 Village lofts
- October 2022 Draft Corridor Plan (Oct. 24, 2022)
- April 2023 Recommended Corridor Plan (April 12, 2023)
- 2018 02 draft d line station plan complete document
- 2010 2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan (LRL copy)
- February 2010 2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan, final report (original MnDOT address)
- November 2020 All TAP Phase III Comments
- February 2009 Appendix L
- February 2000 Busway Feasibility Chapter 7 Key Study Findings
- November 2012 Ch2
- March 2012 Chapter2ExistingRouteStructureandServiceLevels
- March 2012 Chapter3AnalysisofExistingRidershipandRoutePerformance
- 7 January 2014 Comment Cards MPLS
- June 2018 D line final station plan
- December 2009 DraftSRPFinalReport
- November 2009 DraftTechMemo6
- January 2021 E line corridor study apendices compressed
- June 2025 Engagement report
- May 2021 Evaluation of better bus route 3 community engagement summary
- 2009 Evaluation TransitEvalFullReport pdf
- November 2012 ExecSummary.2
- June 2012 ExecutiveSummary
- 17 November 2022 F line dcp nicollet island east bank na
- July 2002 F:\Projects\Minneapolis Sector 5\Route_Profiles\m2_40x28.prn
- July 2002 F:\Projects\Minneapolis Sector 5\Route_Profiles\m54_40x28.prn
- March 2016 Full Meeting Packet 32416
- November 2004 Hiawatha Light Rail Transit System Transportation & Maintenance Operations Plan
- May 2014 Highway Transitway Corridor Study final report
- May 2014 HTCSFinal
- June 2017 LPA Report Appendix A: LPA Overview
- September 2009 LPA TM5 Transit Service DRAFT 090909
- 13 May 2014 May a line open house layouts north
- September 2024 Network now report appendix a
- September 2024 Network now report appendix b
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- February 2004 OperatingCostImpacts
- August 2026 Pleasant & University
- March 2026 Pleasantuniversity
- 16 May 2018 Rev recommended d line station plan final
- 11 May 2022 Route 22 engagement summary
- September 2017 Rush Line Corridor Pre-Project Development Study: LPA Selection Report (final)
- 2017 SIP update report
- 2009 Southwest Transitway Scoping Summary Report (HCRRA, 2009)
- 2024 Station plans d line final station plan
- 2 September 2020 Taac network next update
- June 2025 Tech memo 1 candidate corridor identification
- July 2025 Tech Memo 2: Candidate corridor screening results
- February 2026 Tech Memo 4 Prioritization
- 2018 TPP Update Public Comment Report
- 2019 Transit System Performance Evaluation
- 2020 Vision plan interactive (PDF 63MB)
- August 2026 Washington & West Bank
- March 2026 Washwestbank
- March 2017 West End and Route 9 Recommended Plan
- 3 August 2015 Westbroadwayridershipforecast
- 17 November 2022 Nicollet Island-East Bank Neighborhood Association (Nov. 17, 2022)
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.