Chapter3AnalysisofExistingRidershipandRoutePerformance
- Date
- March 2012 (when the file was made; the document may be a little older)
- Kind
- Studies, plans and reports
- From
- Metro Transit
- File
- PDF, 10 pages, 1.8 MB
- Published as
- Chapter3AnalysisofExistingRidershipandRoutePerformance.pdf
- Published at
- https://www.metrotransit.org/Data/Sites/1/media/pdfs/central/report/Chapter3AnalysisofExistingRidershipandRoutePerformance.pdf
- This copy
- from the Wayback Machine's capture of 2024-06-28
- SHA-256
- 5dfcced4740ebf644ff78a09d5ae765fb1236993d38ce48349ad9007313eabcf
- Filed under
- Bus service plans, Central Corridor
- Names these lines
- METRO Green Line ×3, Route 2 ×1, Route 3 ×1, Route 63 ×1, Route 10 ×1