Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name METRO E Line
167 documents, those that name it most first. The line's own page
- May 2022 Eline finalcorridorplan
- March 2022 ELine RecommendedCorridorPlan Final
- September 2021 Eline draftcorridorplan
- January 2019 E line corridor survey responses
- January 2021 E line corridor study apendices compressed
- January 2020 E Line Corridor Study summary report
- January 2021 E line corridor study technical memo 1
- 2020 0113 14 summary of public comments
- December 2018 Elineinfoboard
- May 2019 E line open house boards
- January 2021 E line corridor study technical memo 2
- September 2024 Network now report
- January 2020 Open house round 3 boards combined
- January 2021 E line corridor study technical memo 3
- 16 April 2022 Village lofts
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- March 2025 Appendix a route changes metrotransit 030925 reduced
- December 2020 Arterial BRT Corridor Concepts - December 2020
- 2021 Legislative report with TCMC Phase 1 study and Twin Cities-Milwaukee HSR sections
- 2020 Metropolitan Area Transit Finance Report
- October 2019 E line update
- 2018 Metropolitan Area Transit Finance Report
- 2022 Metropolitan Area Transit Finance Report
- December 2018 Open house comments
- 22 October 2019 Eline onepager
- May 2019 Metro e line update
- 9 May 2023 E line preliminary design open house rev 1 1
- March 2022 ELineOnePager English
- September 2021 Onepager update
- July 2023 2040 Transportation Policy Plan
- 28 September 2021 Saintanthonypark
- 4 October 2021 Sierraclub
- 27 October 2021 50thfrance
- May 2024 E line outreach fact sheet english phase 6
- 18 October 2021 Eastbdemakaska
- 13 October 2021 Lhena
- 12 October 2021 Lindenhills
- 3 February 2022 Villagelofts
- 9 November 2021 Villagelofts
- May 2024 11 07 671118 24 elinefactsheet hmong
- September 2023 E line preliminary design summary
- November 2019 E line update
- May 2023 Elinefactsheet english aio 2824 somali
- 13 January 2026 Jan. 13, 2026
- 2024 Metropolitan Area Transit Finance Report
- August 2024 Network now final report rsv
- September 2024 Network now report no appendicies small
- 29 March 2022 Uofm
- 27 September 2023 Upcoming b line and e line ifbs and dbe info session
- August 2026 (August 24, 2026)
- 1 March 2022 50thfrancebusinessassociation
- 12 November 2018 Charter of the e line corridor study advisory committee
- May 2023 Elinefactsheet english
- May 2023 Elinefactsheet english aio 2824 hmong
- July 2019 Hennepin bus lanes project summary
- 12 February 2025 Imagine 2050 Transportation Policy Plan: Transit Investment Plan (accessible PDF page)
- 1 March 2022 Lhinc
- 28 March 2022 Marcyholmesinfrastructurecommittee
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- 10 September 2026 Recommended Corridor Plan
- 6 June 2019 Reduced b line open house boards for web english
- May 2019 E line open house comments
- 23 March 2026 H line draft corridor plan
- March 2026 H line draft corridor plan updated
- 23 February 2022 Lhincbusinesssubcommittee
- 23 March 2026 March 23, 2026
- December 2025 Metro e line passport
- September 2024 Network now report appendix a
- September 2022 9 elineonepager english
- 20 September 2022 F line dcp windom park
- August 2023 Final Corridor Plan (Aug. 9, 2023)
- 2020 Network Next: Arterial BRT principles and corridor identification
- February 2021 Network Next: Identifying the Next Arterial BRT Lines (final report)
- April 2023 Recommended Corridor Plan (April 12, 2023)
- 20 September 2022 Windom Park Citizens in Action (Sept. 20, 2022)
- May 2024 11 07 671118 24 elinefactsheet somali
- 14 October 2020 2040 TPP 2020 update: Chapter 6 Transit (TAB draft, Oct 2020)
- November 2020 All TAP Phase III Comments
- September 2021 B line final corridor plan
- August 2019 Chapter 6 Transit Investment Direction and Plan
- 2023 Community Engagement Framework English
- 2023 Community Engagement Framework Spanish
- May 2021 Complete recommended plan
- January 2021 Concept plan full reportfinal
- 7 March 2024 Crystal open house boards
- February 2021 Draft corridor plan
- January 2025 E line construction map
- May 2024 E line construction map
- March 2024 E line construction map 1
- 3 October 2022 F line dcp audubon na
- 5 February 2014 General arterial BRT fact sheet snelling
- 9 May 2014 General arterial BRT fact sheet snelling
- December 2022 Metro diagrammap vision
- undated Metro Transit - H Line FAQS
- September 2024 Network now report appendix b
- January 2021 Ol connectingbus report
- May 2021 Recommended plan report
- 2024 Riverview handout route maps (PDF)
- 2026 Transitways, existing and planned (the layer behind the Development Trends Along Transit reports): metadata
- 3 October 2022 Audubon Neighborhood Association Annual Meeting (Oct. 3, 2022)
- October 2022 Draft Corridor Plan (Oct. 24, 2022)
- 21 April 2026 (April 21, 2026)
- 22 April 2026 (April 22, 2026)
- 27 April 2026 (April 27, 2026)
- 22 April 2026 (April 28, 2026)
- 28 April 2026 (April 28, 2026)
- May 2024 11 07 671118 24 elinefactsheet spanish
- August 2026 15th Avenue & 5th Street
- March 2026 15thave5thst
- June 2019 2040 TPP Gold Line 1 94 Amendment
- 12 February 2025 2050 TPP adoption packet, Section 1: Overview (Feb 12, 2025 Council meeting)
- 2 December 2022 [written Q&A]
- 7 April 2014 Arterial BRT SPOC 2 presentation
- 7 May 2021 Arterial Bus Rapid Transit presentation (May 7, 2021)
- 29 April 2019 B line fact sheet
- June 2024 BLE SDEIS Chapter 6 Indirect Impacts and Cumulativ
- May 2025 Blue Line Extension Chapter 6 Cumulative Potential Effects (per MN Rules § 4410), Reasonably Foreseeable Trends and Future Plans
- October 2023 Chapter2 networkperformanceandopportunities 100423
- June 2012 Chapter3KeyObjectives
- June 2012 ConceptPlanReport
- September 2023 Draft Corridor Plan
- March 2020 Draft Transportation Action Plan Full App web
- February 2022 ELineOnePager Hmong
- February 2022 ELineOnePager Somali
- February 2022 ELineOnePager Spanish
- December 2020 Explore the evaluation results
- 14 November 2022 F line dcp fridley city council
- 7 November 2022 F line dcp marcy holmes infrastructure cmte
- 17 November 2022 F line dcp nicollet island east bank na
- 15 November 2022 F line draft corridor plan open house
- 15 November 2022 F Line Draft Corridor Plan Virtual Open House (Nov. 15, 2022)
- 2 December 2022 F line nov 15 virtual open house responses to questions
- 24 February 2025 Final Corridor Plan
- September 2023 G line draft corridor plan
- February 2021 Grand
- February 2021 Johnson/Lyndale
- August 2020 Learn more about the screening process
- April 2025 Long Range Capital Project Lists
- undated LRL research guide: Light Rail and Commuter Transit timeline (with call numbers)
- September 2024 Meeting Minutes w attachments
- undated Metro Transit - G Line FAQs
- 27 March 2024 Mp eccb packet r00.00 final
- 10 November 2020 Network Next proposed BRT corridors: community engagement summary
- September 2021 Onepager update.hmong
- September 2021 Onepager update.somali
- September 2021 Onepager update.spanish
- April 2025 Overview
- August 2026 Pleasant & University
- March 2026 Pleasantuniversity
- June 2022 Public Engagement Summary Report #3 (Jan-June 2022)
- September 2024 Recommended Corridor Plan
- April 2025 Red Rock Corridor Commission Meeting Packet 04242025 web
- September 2024 Red Rock Corridor Commission Meeting Packet 09302024 web
- 4 September 2025 Scoring mechanism
- 11 October 2023 Summary (CMC)
- February 2021 summary of engagement results
- March 2020 TAP Draft Plan Transit web
- June 2025 Tech memo 1 candidate corridor identification
- February 2026 Tech Memo 4 Prioritization
- August 2025 Transit Priority Implementation Workplan
- March 2026 Washhennepin
- August 2026 Washington & Hennepin
- 14 November 2022 Fridley City Council Conference Meeting (Nov. 14, 2022)
- 7 November 2022 Marcy-Holmes Neighborhood Association Infrastructure Committee (Nov. 7, 2022)
- 17 November 2022 Nicollet Island-East Bank Neighborhood Association (Nov. 17, 2022)
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.