E line corridor study technical memo 3
- Date
- January 2021 (when the file was made; the document may be a little older)
- Kind
- Studies, plans and reports
- From
- Metro Transit
- File
- PDF, 11 pages, 691 KB
- Published as
- e-line-corridor-study-technical-memo-3.pdf
- Published at
- https://www.metrotransit.org/Data/Sites/1/media/e-line/e-line-corridor-study/e-line-corridor-study-technical-memo-3.pdf
- This copy
- from the Wayback Machine's capture of 2025-02-24
- SHA-256
- dcb7513c5b8efa5c709d58ee5ca3028aa33b61c3b69122d91bd4c3126f59698d
- Filed under
- Hennepin Avenue Corridor
- Names these lines
- METRO E Line ×36, Route 36 ×2, METRO Gold Line ×1