Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name METRO A Line
260 documents, those that name it most first. The line's own page
- 31 March 2015 A Line FINAL DCE Complete
- 3 April 2015 A line phase 12 report final
- 20 March 2015 Updated phase I II report cover ltr
- 13 September 2016 Final a line extension evaluation
- February 2018 Detailed Definition of Alternatives Report #7
- September 2024 Network now report
- December 2017 Public Engagement Summary #5 with appendices (Aug-Nov 2017)
- 2018 Metropolitan Area Transit Finance Report
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- March 2025 Appendix a route changes metrotransit 030925 reduced
- 2021 Legislative report with TCMC Phase 1 study and Twin Cities-Milwaukee HSR sections
- 2020 Metropolitan Area Transit Finance Report
- 13 May 2014 May a line open house layouts north
- 2022 Metropolitan Area Transit Finance Report
- 24 July 2014 Aline TAC meeting minutes edited
- 2019 Transit System Performance Evaluation
- December 2023 East Metro Transit Network Opportunities final report
- October 2019 Chapter 2
- 13 May 2014 May a line open house layouts south
- 6 June 2019 Reduced b line open house boards for web english
- October 2019 Chapter 1
- 7 June 2014 Concept plan feedback summary
- 7 June 2014 Concept plan feedback summary rev
- April 2018 11 002 01 18 aline factsheet
- 28 April 2014 Aline TAC meeting minutes
- 9 May 2014 General arterial BRT fact sheet snelling
- 14 October 2020 2040 TPP 2020 update: Chapter 6 Transit (TAB draft, Oct 2020)
- September 2021 B line final corridor plan
- August 2019 Chapter 6 Transit Investment Direction and Plan
- February 2021 Draft corridor plan
- 2020 Network Next: Arterial BRT principles and corridor identification
- 21 August 2013 Snelling BRT CAC 2 presentation
- 21 August 2014 Aline TAC meeting minutes and sketches
- December 2020 Arterial BRT Corridor Concepts - December 2020
- 7 April 2014 Arterial BRT SPOC 2 presentation
- May 2019 E line open house boards
- 16 May 2018 Rev recommended d line station plan final
- 2018 02 draft d line station plan complete document
- June 2018 D line final station plan
- 18 July 2013 Snelling open house 1 summary
- July 2018 003 intro
- 2019 2040 TPP overview, October 2018 update with 2019 amendments
- 2018 2040 Transportation Policy Plan Update Overvi
- 19 February 2014 A line BRT CAC 3 presentation
- 7 April 2014 A line SPOC meeting 2 summary
- August 2026 Como & Snelling
- 5 February 2014 General arterial BRT fact sheet snelling
- 4 December 2014 General arterial BRT fact sheet snelling
- 27 January 2014 Open house comment summary
- August 2021 Purpose and Need Technical Report (August 2021 version)
- 22 April 2014 Roseville pwet commission
- 15 August 2013 Snelling BRT TAC 3 presentation
- August 2026 (August 24, 2026)
- 2020 0113 14 summary of public comments
- 12 May 2014 A line BRT district council meeting
- 5 May 2014 A line open houses flyer final
- 19 February 2014 CAC meeting 3 summary
- May 2022 Eline finalcorridorplan
- 6 October 2021 Findings of Fact and Conclusions, October 2021
- 13 May 2014 May a line open house boards ltr
- February 2021 Network Next: Identifying the Next Arterial BRT Lines (final report)
- August 2024 Network now final report rsv
- September 2024 Network now report no appendicies small
- 10 September 2026 Recommended Corridor Plan
- October 2021 Rush Line BRT Finding of No Significant Impact
- 6 October 2021 Rush Line BRT FOFC FONSI
- 6 October 2021 Rush Line BRT FONSI
- 21 August 2013 Snelling BRT CAC meeting 2 notes
- 24 February 2014 A line BRT TAC 5 presentation
- 21 August 2014 Aline TAC meeting presentations
- September 2021 Eline draftcorridorplan
- March 2022 ELine RecommendedCorridorPlan Final
- September 2024 Network now report appendix a
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- 26 January 2018 Planning Commission Riverview LPA packet (Jan 26, 2018)
- 1 November 2018 Presentation CMC r00 07Final
- May 2016 RRCC Agenda Packet
- October 2016 Sec106 historic resources documentation
- 31 May 2013 Snelling BRT SPOC 1 presentation
- April 2016 Southwest LRT FEIS Appendix M SDEIS Part 4
- April 2016 Southwest LRT FEIS AppM
- October 2019 Transportation Resources
- 24 February 2014 A line BRT TAC 5 summary
- 24 July 2014 A line BRT TAC presentation
- 28 April 2014 Aline TAC meeting presentation
- 7 May 2021 Arterial Bus Rapid Transit presentation (May 7, 2021)
- March 2026 Comosnelling
- January 2019 E line corridor survey responses
- May 2019 E line open house comments
- May 2021 EA Appendix E: Technical Reports Part 1
- 29 March 2024 Economic Development Analysis for the Riverview Transit Corridor (draft)
- December 2018 Elineinfoboard
- undated LRL research guide: Light Rail and Commuter Transit timeline (with call numbers)
- 26 January 2015 Mac groveland info session
- 25 April 2019 Presentation cbac
- 4 April 2019 Presentation CMC r07 00
- 4 October 2018 Presentation CMC rev00.18
- August 2021 Public engagement summary (March 2018-May 2021)
- August 2016 Red Rock Cost Estimation Technical Memorandum v5
- 29 January 2020 Rush Line BRT public engagement summary with appendices (Jan 2020)
- July 2013 Snelling avenue rapid bus vissim evaluation final report
- 2024 What We Heard: Public Engagement Summary Report (EPE phase)
- April 2015 00 SIP FinalReport inclAppendices
- June 2021 11 08 209106 21 blinefactsheet
- July 2023 2040 Transportation Policy Plan
- November 2020 All TAP Phase III Comments
- 2018 Annual Regional Park and Ride System Report
- 7 April 2014 Arterial BRT SPOC 2 final agenda
- 29 April 2019 B line fact sheet
- 28 October 2019 B line fact sheet
- 2015 C 15 Council e Bus Transit Operations Plan Tec
- October 2023 Chapter2 networkperformanceandopportunities 100423
- October 2023 Chapter3 engagement andcustomerfeedback 100423
- January 2021 E line corridor study technical memo 1
- June 2021 Environmental Assessment open house boards
- October 2019 Executive Summary
- 30 October 2018 Fall engagement summary public final
- 26 September 2016 Final Report Red Rock low res
- March 2016 Full Meeting Packet 32416
- 23 March 2026 H line draft corridor plan
- March 2026 H line draft corridor plan updated
- 2017 Highway 169 Mobility Study: review of past studies
- 12 February 2025 Imagine 2050 Transportation Policy Plan: Transit Investment Plan (accessible PDF page)
- 13 January 2026 Jan. 13, 2026
- February 2021 Lowry
- June 2017 LPA Report Appendix A: LPA Overview
- May 2017 LPA Report Appendix B: Public Engagement Summary #4 (draft LPA)
- 23 March 2026 March 23, 2026
- December 2022 Metro diagrammap vision
- undated Metro Transit - G Line FAQs
- undated Metro Transit - H Line FAQS
- 2024 Metropolitan Area Transit Finance Report
- January 2020 Open house round 3 boards combined
- 22 September 2016 Packet
- 13 December 2023 Policy Advisory Committee meeting summary (Dec 13, 2023)
- December 2022 Public Engagement Summary Report (July-Dec 2022)
- April 2025 Red Rock Corridor Commission Meeting Packet 04242025 web
- 18 November 2016 Red Rock Corridor Implementation Plan presentation
- September 2016 Red Rock Implementation Plan Final Report DRAFT v4
- 2024 Riverview handout route maps (PDF)
- March 2021 Riverview LPA Resolutions
- 14 May 2021 Riverview Purpose and Need Graphic Summary Final
- 28 January 2016 RRCC Packet
- 26 October 2016 RRCC Packet
- 15 May 2013 Snelling BRT CAC 1 presentation
- 13 May 2013 Snelling BRT TAC 1 presentation
- 20 September 2013 Stp planning commission
- 21 November 2013 TAC 4 presentation
- 2018 TPP Update Public Comment Report
- August 2025 Transit Priority Implementation Workplan
- 2026 Transitways, existing and planned (the layer behind the Development Trends Along Transit reports): metadata
- 8 January 2018 Transportation Committee packet (Jan 8, 2018; Riverview LPA resolution)
- 15 June 2021 View the Public Open House Boards
- 16 April 2022 Village lofts
- 21 April 2026 (April 21, 2026)
- 22 April 2026 (April 22, 2026)
- 27 April 2026 (April 27, 2026)
- 22 April 2026 (April 28, 2026)
- 28 April 2026 (April 28, 2026)
- January 2020 00 Red Rock Corridor Commission 01302020 Full Meeting Packet
- November 2015 000 draft c line station plan complete
- January 2016 000 recommended c line station plan complete
- July 2018 005 appendix b d line station plan comment summary
- 2019 2019 Network Next Engagement Summary - January 2020
- 24 February 2014 A line BRT TAC 5 agenda
- 28 April 2014 Aline TAC meeting agenda
- 24 July 2014 Aline TAC meeting agenda
- 21 August 2014 Aline TAC meeting agenda
- March 2019 Allianz Fact Sheet Transit
- 2017 Annual Regional Park and Ride System Report
- April 2018 Appendixc summary updatedimprovements
- April 2018 Appendixe summary proposedimprovements
- April 2018 Appendixf resourceimpacts proposedimprovements
- 19 February 2021 Arterial BRT Corridor Evaluation and Prioritization: Ridership Forecasts - February 2021
- 31 May 2013 Arterial BRT SPOC 1 summary revised
- April 2022 BlueLine RiverviewConnection VirtualOpenHouse 1
- July 2016 Bottineau LRT FEIS Chapter 07 Environmental Justice
- January 2018 Bus Rapid Transit Operations and Maintenance Costs PDF
- 22 September 2015 Bus rapid transit projects move forward in the twin cities startribune
- 2015 C 23 Council m Travel Demand Methodology and F
- October 2016 C line approved DCE without 106
- 2015 C line planning phase outreach summary spring
- March 2013 CAC info packet
- June 2019 Chapter 14 Work Program
- 2023 Community Engagement Framework English
- 2023 Community Engagement Framework Spanish
- 19 June 2019 Comprehensive Plan Transportation chapter (approved June 2019)
- 7 March 2024 Crystal open house boards
- September 2023 Draft Corridor Plan
- March 2020 Draft Transportation Action Plan Full App web
- January 2021 E line corridor study apendices compressed
- January 2020 E Line Corridor Study summary report
- September 2019 EA Appendix A Technical Report 1: Purpose and Need
- 14 November 2022 F line dcp fridley city council
- 20 September 2022 F line dcp windom park
- 15 November 2022 F line draft corridor plan open house
- 15 November 2022 F Line Draft Corridor Plan Virtual Open House (Nov. 15, 2022)
- April 2016 Final C Line Station Plan
- 24 February 2025 Final Corridor Plan
- August 2023 Final Corridor Plan (Aug. 9, 2023)
- August 2021 Ford Spur final report appendix
- 20 October 2015 Formatted newsletter
- September 2023 G line draft corridor plan
- July 2019 Hennepin bus lanes project summary
- 26 October 2023 May-September 2023 Engagement Summary Report and Appendices
- October 2022 Meeting Minutes
- October 2022 Meeting Minutes Approved
- September 2024 Meeting Minutes w attachments
- 24 February 2022 Meeting summary (PAC)
- 20 September 2024 Mem lamothe projectcommitteemembers maplewood
- July 2016 METRO Blue Line LRT Extension Final EIS (full report)
- undated Metro Transit - F Line FAQS
- 29 May 2018 Mm gbrt cbac final
- 19 July 2023 Mm rms boards r07 compressed compressed
- 1 November 2018 MN CMC final
- September 2024 Network now report appendix b
- 10 June 2015 Orange line TAC
- 9 November 2015 Orange line transportation committee design contract
- December 2014 Packet
- October 2019 Pages from chapter 3.2
- 26 October 2018 Presentation cbac r00 02
- October 2022 Priorities FINAL
- March 2023 Project overview: Karen (PDF)
- March 2023 Project overview: Somali (PDF)
- January 2023 Project priorities and timeline (Jan 2023)
- December 2021 Public Engagement Summary Report #2 (July-Dec 2021)
- June 2022 Public Engagement Summary Report #3 (Jan-June 2022)
- June 2023 Public Engagement Summary Report (Jan-June 2023)
- December 2023 Public Engagement Summary Report (July-Dec 2023)
- February 2021 Randolph/East 7th
- September 2024 Recommended Corridor Plan
- 8 February 2023 Red Rock Corridor Commission Meeting Packet
- September 2024 Red Rock Corridor Commission Meeting Packet 09302024 web
- August 2016 Red Rock Travel Demand Forecasting Report v6
- June 2018 Riverview Corridor LPA map
- 2019 Riverview fact sheet (2019)
- November 2021 Riverview Fact Sheet 11.21
- 2020 Riverview Fact Sheet 2020
- 10 October 2018 Riverview LPA / TPP amendment presentation (Oct 10, 2018)
- May 2025 Riverview Modern Streetcar Station Area Plans
- January 2014 RRCC Agenda Packet
- 15 November 2018 Rush Line BRT update (Nov 15, 2018)
- 7 January 2019 Rush Line Purpose & Need One Pager
- April 2015 SIP FinalReport Ch03
- April 2015 SIP FinalReport Ch05
- 21 August 2013 Snelling BRT CAC 2 agenda
- 15 August 2013 Snelling BRT TAC 3 agenda
- 21 November 2013 Snelling BRT TAC 4 agenda
- 9 July 2013 Snelling open house 1 boards
- October 2019 Table of contents2
- March 2020 TAP Draft Plan Transit web
- June 2025 Tech memo 1 candidate corridor identification
- 27 September 2023 Upcoming b line and e line ifbs and dbe info session
- April 2025 Work Program
- October 2022 Draft Corridor Plan (Oct. 24, 2022)
- 14 November 2022 Fridley City Council Conference Meeting (Nov. 14, 2022)
- April 2023 Recommended Corridor Plan (April 12, 2023)
- 20 September 2022 Windom Park Citizens in Action (Sept. 20, 2022)
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.