Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Route 716
32 documents, those that name it most first. The line's own page
- August 2003 Existing Conditions Report
- April 2007 Appendix AllRoutes
- September 2003 716
- September 2024 Network now report
- December 2006 Route716
- July 2012 Bottineau LRT TechRept Transit Operations Plans
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- September 2003 NW CH 3
- April 2007 04 Final Plan
- March 2025 Appendix a route changes metrotransit 030925 reduced
- April 2007 01 Summary ExistNetwk
- October 2015 METRO Blue Line Extension Feeder Bus Plan
- September 2003 NW CH 5
- December 2006 Route758
- April 2007 07 Implement Sched
- April 2009 716
- April 2009 717
- April 2009 767
- September 2016 Appendices
- March 2014 Bottineau Draft EIS Chapter 3: Transportation analysis
- May 2014 Bottineau LRT DEIS Comments CivicOrgs
- May 2014 Bottineau LRT FEIS Appendix G 08 DEIS Comments Civic Organi
- March 2014 Bottineau Transitway Draft EIS
- April 2007 ExecutiveSummary
- April 2007 Fig10 SuburbanLocRts
- September 2024 Network now report appendix a
- September 2024 Network now report appendix b
- September 2003 NW Ch 1
- April 2009 Poster
- April 2009 Summary
- 2023 Updated Crystal station area plan - 2023 (PDF)
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.