Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Route 667
26 documents, those that name it most first. The line's own page
- September 2024 Network now report
- 2015 C 15 Council e Bus Transit Operations Plan Tec
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- January 2013 Service concepts
- March 2025 Appendix a route changes metrotransit 030925 reduced
- March 2013 AppendixB
- July 2013 Ch2
- May 2013 Comments
- February 2017 Hwy169NTechMemoApp
- July 2013 Route667map
- March 2013 AppendixA
- July 2013 Ch1
- May 2014 Highway Transitway Corridor Study Tech Memo 3: Corridor concepts and evaluation
- September 2024 Network now report appendix a
- May 2012 Fig. 3 6
- February 2015 Highway 55 final report addendum
- May 2014 Highway Transitway Corridor Study final report
- May 2014 HTCSFinal
- August 2024 Network now final report rsv
- September 2024 Network now report appendix b
- September 2024 Network now report no appendicies small
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- April 2016 Southwest LRT FEIS Ch04
- April 2013 West suburban presentation
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.