Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Route 5
126 documents, those that name it most first. The line's own page
- June 2018 D line final station plan
- 16 May 2018 Rev recommended d line station plan final
- 2018 02 draft d line station plan complete document
- 22 July 2022 D line 2022 title vi service equity analysis report
- July 2018 003 intro
- 2024 Station plans d line final station plan
- January 2016 000 recommended c line station plan complete
- August 2003 Existing Conditions Report
- April 2016 Final C Line Station Plan
- April 2012 Arterial Transitway Corridors Study final report
- April 2015 00 SIP FinalReport inclAppendices
- November 2015 000 draft c line station plan complete
- July 2018 005 appendix b d line station plan comment summary
- July 2012 Bottineau LRT TechRept Transit Operations Plans
- July 2018 004 appendix a other station locations considered
- April 2007 Appendix AllRoutes
- May 2022 D line local routes factsheet
- 2015 C 15 Council e Bus Transit Operations Plan Tec
- 13 November 2019 D line fact sheet
- 14 March 2019 D line fact sheet
- September 2003 005
- 2018 01 d line fact sheet
- April 2007 04 Final Plan
- June 2024 BLE SDEIS Appendix A 3 Traffic and Aviation Docume
- September 2024 Network now report
- September 2003 NW CH 3
- June 2018 11 02 26173 18 factsheet dline somali
- May 2021 Complete recommended plan
- September 2009 LPA TM5 Transit Service DRAFT 090909
- December 2006 Route005
- March 2015 08 AppendixG SIPImprovementsbyRegion
- March 2025 Appendix a route changes metrotransit 030925 reduced
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- March 2021 11 02 183705 21 d line factsheet
- February 2009 Appendix L
- April 2018 Appendixe summary proposedimprovements
- April 2018 Appendixf resourceimpacts proposedimprovements
- January 2021 Concept plan full reportfinal
- 2018 Metropolitan Area Transit Finance Report
- 2022 Metropolitan Area Transit Finance Report
- September 2003 NW CH 5
- May 2021 Recommended plan report
- 6 June 2019 Reduced b line open house boards for web english
- April 2016 Southwest LRT FEIS Ch04
- December 2017 Southwest LRT Supplemental Environmental Assessment Append
- 2009 Southwest Transitway Scoping Summary Report (HCRRA, 2009)
- July 2018 006 appendix c agency comments
- April 2007 01 Summary ExistNetwk
- April 2007 03 Public Involv Proc
- March 2015 07 AppendixF SIPImprovementsbyRt
- March 2015 11 AppendixJ NewAnnualRidesandResources
- June 2022 Addendum Bottineau LRT Route Modification Report F
- April 2018 Appendix c
- June 2024 BLE SDEIS Appendix A 9 Agency Coordination and Eng
- October 2016 C line approved DCE without 106
- October 2023 Chapter2 networkperformanceandopportunities 100423
- April 2007 ExecutiveSummary
- 2021 Legislative report with TCMC Phase 1 study and Twin Cities-Milwaukee HSR sections
- 16 April 2015 Memo 2 problem statement final
- 2020 Metropolitan Area Transit Finance Report
- 13 February 2013 Midtown AA Tech Memo 2: Review and Summary of Previously Completed Work
- April 2013 Midtown corridor purpose and need full
- November 2020 MPLSTAP Final v4 red ADA
- December 2020 MPLSTAP Final v8 redline
- January 2021 Ol connectingbus report
- December 2006 Route019
- December 2006 Route022
- December 2006 Route768
- May 2015 Station Design Comments Received
- December 2020 Transportation Action Plan: introduction and overview (PDF)
- April 2007 02 Philos Strat Recom
- March 2015 05 AppendixD SIP Outreach
- April 2007 05 Plan Impacts
- April 2007 07 Implement Sched
- February 2016 14 olson 7th street recommended station plan
- July 2010 21st Street Transit Routes
- 19 February 2014 A line BRT CAC 3 presentation
- 24 February 2014 A line BRT TAC 5 presentation
- 7 April 2014 A line SPOC meeting 2 summary
- November 2020 All TAP Phase III Comments
- September 2016 Appendices
- February 2022 AppendixC_BLRT Public Engagement Report (Dec 2021 - Jan 2022)
- 7 April 2014 Arterial BRT SPOC 2 presentation
- 7 May 2021 Arterial Bus Rapid Transit presentation (May 7, 2021)
- June 2024 BLE SDEIS A 3 Transportation
- June 2024 BLE SDEIS Appendix A CR Preparation Notices Commen
- March 2014 Bottineau Draft EIS Chapter 3: Transportation analysis
- May 2014 Bottineau LRT DEIS Comments CivicOrgs
- May 2014 Bottineau LRT FEIS Appendix G 08 DEIS Comments Civic Organi
- March 2014 Bottineau Transitway Draft EIS
- 2015 C 23 Council m Travel Demand Methodology and F
- October 2023 Chapter3 engagement andcustomerfeedback 100423
- May 2022 D line local routes factsheet spanish
- 11 November 2015 Economic development impacts of transit
- 14 November 2022 F line dcp fridley city council
- 20 September 2022 F line dcp windom park
- 15 November 2022 F line draft corridor plan open house
- 15 November 2022 F Line Draft Corridor Plan Virtual Open House (Nov. 15, 2022)
- July 2002 F:\Projects\Minneapolis Sector 5\Route_Profiles\m5_40x28.prn
- April 2007 Fig09 UrbanLocalRts
- January 2011 Final Document web version
- 12 February 2025 Imagine 2050 Transportation Policy Plan: Transit Investment Plan (accessible PDF page)
- 24 March 2015 Memo 1 relevant issues
- 18 April 2012 Midtown Corridor AA scope of work
- January 2013 Midtown corridor key issues memo
- 10 November 2020 Network Next proposed BRT corridors: community engagement summary
- September 2024 Network now report appendix a
- September 2024 Network now report appendix b
- January 2021 Ol connectingbus execsummary
- July 2010 Penn Transit Routes
- July 2010 Royalston Transit Routes
- April 2015 SIP FinalReport Ch03
- April 2015 SIP FinalReport Ch04
- 2018 Southwest LRT Amended ROD-( )
- 16 February 2018 Southwest LRT Supplemental Environmental Assessment
- February 2018 Southwest LRT Supplemental Environmental Assessment
- June 2015 Station area plan (PDF 6MB)
- 21 November 2013 TAC 4 presentation
- December 2020 TAP Final PROGRESS
- December 2020 Transportation Action Plan: Transit chapter (PDF)
- July 2010 Van White Transit Routes
- 16 April 2022 Village lofts
- July 2010 West Lake Transit
- 14 November 2022 Fridley City Council Conference Meeting (Nov. 14, 2022)
- 20 September 2022 Windom Park Citizens in Action (Sept. 20, 2022)
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.