Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Route 850
16 documents, those that name it most first. The line's own page
- September 2024 Network now report
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- March 2025 Appendix a route changes metrotransit 030925 reduced
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- August 2024 Network now final report rsv
- September 2024 Network now report no appendicies small
- October 2014 Draft SIP All
- October 2014 executive summary
- May 2014 Highway Transitway Corridor Study Tech Memo 3: Corridor concepts and evaluation
- September 2024 Network now report appendix a
- September 2024 Network now report appendix b
- 2013 Northstar Corridor Rail Project Before-and-After Study
- March 2023 Northstar Post-Pandemic Study Appendix A: Corridor history and existing conditions
- October 2014 Table2
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.