Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Route 722
29 documents, those that name it most first. The line's own page
- August 2003 Existing Conditions Report
- September 2003 722
- September 2024 Network now report
- April 2007 Appendix AllRoutes
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- December 2006 Route722
- July 2012 Bottineau LRT TechRept Transit Operations Plans
- March 2025 Appendix a route changes metrotransit 030925 reduced
- September 2003 NW CH 3
- April 2007 04 Final Plan
- September 2024 Network now report appendix a
- December 2006 Route022
- April 2015 00 SIP FinalReport inclAppendices
- March 2015 05 AppendixD SIP Outreach
- April 2007 05 Plan Impacts
- April 2007 07 Implement Sched
- September 2016 Appendices
- June 2024 BLE SDEIS Chapter 3 Transportation
- March 2014 Bottineau Draft EIS Chapter 3: Transportation analysis
- May 2014 Bottineau LRT DEIS Comments CivicOrgs
- May 2014 Bottineau LRT FEIS Appendix G 08 DEIS Comments Civic Organi
- March 2014 Bottineau Transitway Draft EIS
- April 2007 ExecutiveSummary
- April 2007 Fig10 SuburbanLocRts
- September 2024 Network now report appendix b
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- 11 May 2022 Route 22 engagement summary
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.