Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Route 7
96 documents, those that name it most first. The line's own page
- March 2025 Bbr7 engagement summary
- May 2021 Complete recommended plan
- July 2012 Bottineau LRT TechRept Transit Operations Plans
- January 2021 Concept plan full reportfinal
- May 2021 Recommended plan report
- August 2026 (August 24, 2026)
- 23 March 2026 H line draft corridor plan
- March 2026 H line draft corridor plan updated
- 23 March 2026 March 23, 2026
- January 2021 Ol connectingbus report
- 10 September 2026 Recommended Corridor Plan
- 2025 Better Bus Routes route 7 map update
- February 2004 PlannedImprov
- April 2007 Appendix AllRoutes
- 21 April 2020 Concept plan engagement summary final
- September 2024 Network now report
- December 2006 Route007
- April 2007 04 Final Plan
- September 2016 Appendices
- May 2025 Better Bus Routes route 7 bus stop changes
- March 2025 Appendix a route changes metrotransit 030925 reduced
- October 2015 METRO Blue Line Extension Feeder Bus Plan
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- January 2021 Ol connectingbus execsummary
- June 2015 Station area plan (PDF)
- August 2025 Transit Priority Implementation Workplan
- April 2015 00 SIP FinalReport inclAppendices
- 2018 02 draft d line station plan complete document
- June 2024 BLE SDEIS Appendix A 9 Agency Coordination and Eng
- March 2014 Bottineau Draft EIS Chapter 3: Transportation analysis
- May 2014 Bottineau LRT DEIS Comments CivicOrgs
- May 2014 Bottineau LRT FEIS Appendix G 08 DEIS Comments Civic Organi
- May 2016 Bottineau LRT FEIS Appendix H 4b Theo Wirth Cultural Landsc
- March 2014 Bottineau Transitway Draft EIS
- June 2018 D line final station plan
- April 2007 ExecutiveSummary
- April 2016 Final C Line Station Plan
- January 2021 Molconnectingroutes 7 515
- 16 May 2018 Rev recommended d line station plan final
- October 2018 Shared mobility recommendations (PDF)
- 2024 Station plans d line final station plan
- November 2015 000 draft c line station plan complete
- January 2016 000 recommended c line station plan complete
- April 2007 01 Summary ExistNetwk
- March 2015 05 AppendixD SIP Outreach
- April 2007 07 Implement Sched
- June 2022 Addendum Bottineau LRT Route Modification Report F
- September 2021 B line final corridor plan
- June 2024 BLE SDEIS A 3 Transportation
- October 2019 Chapter 2
- February 2021 Draft corridor plan
- July 2002 F:\Projects\Minneapolis Sector 5\Route_Profiles\m7_40x28.prn
- April 2007 Fig09 UrbanLocalRts
- August 2023 Final Corridor Plan (Aug. 9, 2023)
- February 2017 Full recommended plan appendices
- June 2014 HTCSTechMemo1
- December 2021 JULY AUG Report
- 24 March 2015 Memo 1 relevant issues
- 16 April 2015 Memo 2 problem statement final
- 2024 Metropolitan Area Transit Finance Report
- 13 February 2013 Midtown AA Tech Memo 2: Review and Summary of Previously Completed Work
- 18 April 2012 Midtown Corridor AA scope of work
- April 2013 Midtown corridor purpose and need full
- August 2024 Network now final report rsv
- September 2024 Network now report appendix a
- September 2024 Network now report appendix b
- September 2024 Network now report no appendicies small
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- 2009 Public Hearing Transcript 9 17
- February 2004 PublicInvolvementProcess
- December 2006 Route032
- April 2015 SIP FinalReport Ch04
- June 2015 Station area plan (PDF 6MB)
- February 1985 TH 55 (Hiawatha Avenue) Final EIS / 4(f) Evaluation and Alternatives Analysis
- 2020 Vision plan interactive (PDF 63MB)
- March 2026 Wash10thaven
- March 2026 Wash11thaves
- March 2026 Wash3rdaven
- March 2026 Wash6thaven
- March 2026 Washcedar
- March 2026 Washchicago
- March 2026 Washhennepin
- August 2026 Washington & 10th Avenue N
- August 2026 Washington & 11th Avenue S
- August 2026 Washington & 3rd Avenue N
- August 2026 Washington & 5th Avenue S
- August 2026 Washington & 6th Avenue N
- August 2026 Washington & Cedar
- August 2026 Washington & Chicago
- August 2026 Washington & Hennepin
- March 2026 Washmarq2
- March 2017 West End and Route 9 Recommended Plan
- October 2022 Draft Corridor Plan (Oct. 24, 2022)
- April 2023 Recommended Corridor Plan (April 12, 2023)
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.