Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Route 540
40 documents, those that name it most first. The line's own page
- May 2021 Complete recommended plan
- January 2021 Concept plan full reportfinal
- January 2021 Ol connectingbus report
- May 2021 Recommended plan report
- September 2024 Network now report
- March 2025 Appendix a route changes metrotransit 030925 reduced
- 21 April 2020 Concept plan engagement summary final
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- February 2004 PlannedImprov
- June 2018 D line final station plan
- 2024 Station plans d line final station plan
- 2018 02 draft d line station plan complete document
- May 2019 E line open house boards
- 16 May 2018 Rev recommended d line station plan final
- 30 April 2013 Draft orange line project plan web version
- 17 June 2013 Draft orange line project plan web version
- 9 July 2013 Final orange line project plan web version
- April 2014 METRO Orange Line BRT Project Plan Update (draft 2.0)
- January 2021 Molconnectingroutes 540 542
- September 2024 Network now report appendix a
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- January 2021 Ol connectingbus execsummary
- February 2004 OperatingCostImpacts
- July 2018 33 americanbloomington
- 12 May 2014 494 35w interchange update to city councils
- 28 April 2014 494 35w open house boards
- 18 November 2013 Bloomington city council packet
- July 2017 Dan Patch Corridor Commuter Rail Feasibility Study
- January 2019 E line corridor survey responses
- July 2002 F:\Projects\Minneapolis Sector 5\Route_Profiles\m540_40x28.prn
- February 2004 Fig18FutureServiceandFacili
- 18 November 2013 Knox avenue handout for city councils
- 13 December 2013 METRO Orange Line Existing Conditions Report (draft 4.0)
- August 2024 Network now final report rsv
- September 2024 Network now report appendix b
- September 2024 Network now report no appendicies small
- December 2018 Open house comments
- May 2021 Recommended plan route 539
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.