Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Route 54
166 documents, those that name it most first. The line's own page
- February 2018 Detailed Definition of Alternatives Report #7
- December 2017 Public Engagement Summary #5 with appendices (Aug-Nov 2017)
- August 2026 (August 24, 2026)
- 10 September 2026 Recommended Corridor Plan
- 23 March 2026 H line draft corridor plan
- March 2026 H line draft corridor plan updated
- June 2017 LPA Report Appendix A: LPA Overview
- 23 March 2026 March 23, 2026
- 2024 What We Heard: Public Engagement Summary Report (EPE phase)
- April 2012 Arterial Transitway Corridors Study final report
- September 2024 Network now report
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- April 2022 Purpose and Need Technical Report
- August 2021 Purpose and Need Technical Report (August 2021 version)
- 29 February 2024 Policy Advisory Committee meeting notes (Feb 29, 2024)
- 26 July 2024 Summary (CBAC)
- April 2015 00 SIP FinalReport inclAppendices
- May 2017 LPA Report Appendix B: Public Engagement Summary #4 (draft LPA)
- 2017 LPA Report Appendix C: Resolutions of Support
- February 2018 Report #8: Riverview Corridor Pre-Project Development Study (final)
- May 2021 Rush Line BRT Environmental Assessment
- 5 December 2023 Meeting Summary
- 29 February 2024 Policy Advisory Committee presentation #9 (Feb 29, 2024)
- 27 February 2024 Presentation (CAC)
- May 2025 Riverview Modern Streetcar Station Area Plans
- May 2021 EA Appendix E: Technical Reports Part 1
- 26 August 2024 Transportation Committee info item: Riverview (Aug 26, 2024)
- March 2015 08 AppendixG SIPImprovementsbyRegion
- March 2025 Appendix a route changes metrotransit 030925 reduced
- October 2019 Chapter 2
- 27 February 2024 Community Advisory Committee meeting summary (Feb 27, 2024)
- 2025 Fall/Winter 2025 Engagement Summary
- August 2024 Network now final report rsv
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- September 2024 Network now report no appendicies small
- February 2004 PlannedImprov
- 31 January 2024 Policy Advisory Committee meeting notes (Jan 31, 2024)
- 13 December 2023 Policy Advisory Committee meeting summary (Dec 13, 2023)
- September 2017 Rush Line Corridor Pre-Project Development Study: LPA Selection Report (final)
- 10 January 2024 Summary (CMC)
- October 2019 Transportation Resources
- March 2018 06 25 4378 18 Route 54 flyer
- 2019 2019 Riverview TPP amendment public comment report
- 27 February 2019 Business item 2019-37: Riverview TPP amendment report with comment responses (Feb 27, 2019)
- October 2019 Chapter 1
- October 2014 Draft SIP All
- September 2019 EA Appendix A Technical Report 2: Alternatives
- 29 March 2024 Economic Development Analysis for the Riverview Transit Corridor (draft)
- October 2014 executive summary
- 6 October 2021 Findings of Fact and Conclusions, October 2021
- 5 November 2020 Meeting Summary
- 25 August 2022 Meeting Summary
- September 2024 Network now report appendix a
- 28 July 2017 Planning Commission: Rush Line LPA support (Jul 28, 2017)
- 2021 Public Engagement Summary Report #1 (Sept 2020-June 2021)
- 23 February 2024 Purple Line Community and Business Advisory Committee February 23, 2024
- July 2021 Purpose and Need Public Review Summary
- July 2021 Purpose and Need Public Review Summary Report
- 2020 Ramsey County 4 to 3 Conversion Study Appendix
- 14 May 2021 Riverview Purpose and Need Graphic Summary Final
- October 2021 Rush Line BRT Finding of No Significant Impact
- 6 October 2021 Rush Line BRT FOFC FONSI
- 6 October 2021 Rush Line BRT FONSI
- 24 April 2017 Rush Line transit study update (Apr 24, 2017)
- May 2021 Section 4(f) Evaluation (13 MB)
- February 2004 StPaul
- 6 June 2024 Summary (CMC)
- 15 July 2024 Summary Report
- March 2024 Table
- October 2014 Table2
- 13 November 2017 Transportation Committee info item: Riverview Corridor (Nov 13, 2017)
- 2018 02 draft d line station plan complete document
- March 2015 07 AppendixF SIPImprovementsbyRt
- March 2015 11 AppendixJ NewAnnualRidesandResources
- August 2008 2030transitmasterstudy
- February 2019 2040TppRiverviewAmend
- July 2018 35 moatransitcenter
- 7 April 2014 A line SPOC meeting 2 summary
- 29 February 2024 Agenda
- 27 February 2024 Agenda
- April 2018 Appendixa resourceimpacts implementedimprovements
- April 2025 Aviation System Plan
- February 2004 CapitalandFacilityRecom
- November 2012 Ch7
- November 2012 Ch8
- June 2012 Chapter7Facilities
- June 2012 Chapter8Timeline
- 29 January 2024 Community Advisory Committee meeting summary (Jan 29, 2024)
- June 2012 ConceptPlanReport
- June 2018 D line final station plan
- December 2024 Display Boards
- September 2023 Draft Corridor Plan
- May 2021 EA Appendix E: Technical Reports Part 3
- December 2023 East Metro Transit Network Opportunities final report
- November 2025 English
- July 2013 ESChapter2
- October 2019 Executive Summary
- July 2002 F:\Projects\Minneapolis Sector 5\Route_Profiles\m54_40x28.prn
- 24 February 2025 Final Corridor Plan
- February 2014 Finalcctransitstudyreportupdate
- August 2021 Ford Spur final report appendix
- September 2023 G line draft corridor plan
- May 2014 Highway Transitway Corridor Study final report
- 2014 Highway Transitway Corridor Study Tech Memo 2
- May 2014 Highway Transitway Corridor Study Tech Memo 3: Corridor concepts and evaluation
- May 2014 HTCSFinal
- November 2025 Karen
- August 2026 Maryland & Arcade
- August 2026 Maryland & Clarence
- August 2026 Maryland & Hazelwood
- August 2026 Maryland & White Bear
- March 2026 Marylandarcade
- March 2026 Marylandclarence
- March 2026 Marylandhazelwood
- March 2026 Marylandwhitebear
- 26 October 2023 May-September 2023 Engagement Summary Report and Appendices
- undated Metro Transit - Bronze Line Project
- undated Metro Transit - H Line Engagement
- 19 July 2023 Mm rms boards r07 compressed compressed
- 10 November 2020 Network Next proposed BRT corridors: community engagement summary
- September 2024 Network now report appendix b
- 2024 PAC update: comparison of options
- September 2012 PlanChangesClarifications
- 6 December 2023 Presentation (CBAC)
- 29 June 2023 Presentation (CMC)
- 11 October 2023 Presentation (CMC)
- 13 September 2023 Presentation (CMC)
- August 2021 Public engagement summary (March 2018-May 2021)
- December 2022 Public Engagement Summary Report (July-Dec 2022)
- 21 June 2023 Purple Line CBAC Presentation
- 11 September 2023 Purple Line CBAC Presentation September 2023
- 25 October 2024 Purple Line Community Business Advisory Committee October 2024
- 10 January 2024 Purple Line Corridor Management Committee January 2024 ADA
- 14 October 2024 Purple Line Corridor Management Committee October 2024
- January 2024 Purpleline factsheet 1
- 20 January 2023 RCEPE Riverview vehicle comparison 8.5x11 FINAL
- May 2025 Read the Route Modification Study Phase II Report Executive Summary
- September 2024 Recommended Corridor Plan
- November 2012 RecPlan.2
- August 2016 Red Rock Service Plan Technical Memorandum v4
- 16 May 2018 Rev recommended d line station plan final
- 26 January 2018 Riverview Corridor presentation to Planning Commission (Jan 26, 2018)
- 2014 Riverview Corridor project library
- 2014 Riverview Corridor Project Library (PPD 2014-2017 final study documents)
- 10 October 2018 Riverview LPA / TPP amendment presentation (Oct 10, 2018)
- 29 April 2021 RRCC Packet
- 13 July 2020 Rush Line BRT
- 29 January 2020 Rush Line BRT public engagement summary with appendices (Jan 2020)
- September 2018 Rush Line Environmental Analysis Phase
- May 2018 Rush Line Environmental Analysis Phase Flyer
- July 2019 Rush Line factsheet
- 20 March 2019 Rush Line Flyer En
- 2018 Rush Line Public Engagement Summary March to September
- April 2015 SIP FinalReport Ch03
- 2017 SIP update report
- 2024 Station plans d line final station plan
- 28 June 2024 Summary (CBAC)
- 11 October 2024 Summary (CBAC)
- 7 March 2024 Summary (CMC)
- November 2025 Tech Memo 3: Technical evaluation results
- 24 July 2025 The current location and design of Arcade Street Station
- 14 November 2022 Transit vehicle comparison (PDF)
- 10 March 2025 West 7th Corridor Concept (public presentation)
- 2024 What We Heard summary presentation (Sept 2020-Aug 2024)
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.