Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Route 323
16 documents, those that name it most first. The line's own page
- September 2024 Network now report
- March 2025 Appendix a route changes metrotransit 030925 reduced
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- September 2024 Network now report appendix a
- August 2026 (August 24, 2026)
- June 2025 Engagement report
- 23 March 2026 H line draft corridor plan
- March 2026 H line draft corridor plan updated
- 23 March 2026 March 23, 2026
- September 2024 Network now report appendix b
- 10 September 2026 Recommended Corridor Plan
- August 2026 Sun Ray Transit Center
- March 2026 Sunraytransitcenter
- June 2025 Tech memo 1 candidate corridor identification
- July 2025 Tech Memo 2: Candidate corridor screening results
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.