- Also known as
- I-35W BRT, METRO Orange Line
- Running there today
- METRO Orange Line
- Documents
- 197
Key documents
- 24 May 2016 METRO Orange Line draft Environmental Benefits and Impacts
- 2016 FTA Small Starts project profile: METRO Orange Line (FY17)
- April 2014 METRO Orange Line BRT Project Plan Update (draft 2.0)
- 13 December 2013 METRO Orange Line Existing Conditions Report (draft 4.0)
- 14 January 2005 I-35W BRT Study
Everything else found (192)
Studies, plans and reports (13)
2021
- May 2021 Recommended plan report
- May 2021 Recommended plan appendix a
- May 2021 Complete recommended plan
- January 2021 Ol connectingbus report
2016
- May 2016 Appendix f traffic study
2015
- 9 December 2015 Orange Line Extension plan
- 2015 Appendix k orange line ridership modeling
2014
- 16 July 2014 CTIB plans to up its share of transit costs fc
2013
- December 2013 Tech memo I 35w BRT station final 120513
- 9 July 2013 Final orange line project plan web version
- 17 June 2013 Draft orange line project plan web version
- 30 April 2013 Draft orange line project plan web version
2004
- April 2004 Task 1 Report
Meetings: agendas, presentations, minutes (29)
2018
- 9 January 2018 TAC 23
2017
- 11 July 2017 Orange line technical advisory committee
- 13 June 2017 Orange line TAC presentation
2016
- 13 December 2016 Orange line TAC
- 13 September 2016 Orange line technical advisory group meeting
- 22 August 2016 Orange line transportation committee
- 9 August 2016 Orange line TAC meeting
- 14 June 2016 Orange line TAC meeting
- 10 May 2016 Orange line TAC presentation
- 7 March 2016 Orange line TAC
2015
- 9 November 2015 Orange line transportation committee design contract
- 10 September 2015 Orange line TAC meeting
- 10 June 2015 Orange line TAC
- 10 June 2015 Ol TAC meeting 6 notes
- 10 June 2015 Ol TAC meeting 6
2014
- 11 December 2014 Orange line TAC meeting 5
- 11 December 2014 Ol TAC meeting 5 agenda
- 14 May 2014 Orange line BRT at 494 corridor commission
- 14 April 2014 Orange line ppu transportation committee
- 31 March 2014 Orange line TAC meeting 4
- 24 March 2014 Orange line transportation committee
2013
- 18 November 2013 Bloomington city council packet
- 6 August 2013 Orange line TAC meeting 2
- 23 July 2013 Orange line I 494 corridor commission
- 5 June 2013 Orange line richfield transportation commission
- 3 May 2013 Ol TAC packet
- 30 April 2013 Orange line intro TAC
- 22 April 2013 Orange line presentation transportation committee
- 28 March 2013 Orange line intro 35 lake PAC
Outreach: fact sheets, open houses, engagement (31)
2021
- January 2021 Olcbs executive summary aio 2107 spanish
- January 2021 Olcbs executive summary aio 2107 somali
2020
- March 2020 Metrotransit knox Ave business handout v4
2019
- 1 July 2019 Orange line handout
2016
- 10 August 2016 Orange line 494 corridor update
- 12 July 2016 Orange line update DCRRA updated
- 21 June 2016 Orange line update DCRRA
- 2016 Brochure
2015
- 28 July 2015 Orange line DCRRA update
- 13 July 2015 Orange line update bloomington city council
- 13 July 2015 Orange line transportation committee knox downtown update
- 7 July 2015 Orange line HCRRA update
- July 2015 S.terminus survey report
- 6 May 2015 TAC orange line update
- 28 April 2015 494 commuter orange line update
2014
- 24 November 2014 Orange line bloomington city council update
- 15 June 2014 All olppu public comments
- 21 May 2014 Orange line basic handout
- 12 May 2014 494 35w interchange update to city councils
- 30 April 2014 Orange line plans ready for comment fc
- 28 April 2014 Open house monday to hear ideas on the I 494 and I 35w interchange kstp
- 28 April 2014 494 35w open house boards
- 5 March 2014 Orange line BRT update bloomington chamber public affairs forum
- 2014 Orange line brochure
2013
- 18 November 2013 Knox avenue handout for city councils
- November 2013 66th street concept design board
- 10 October 2013 Orange line station update 35w solutions alliance
- 3 October 2013 Plans to upgrade 35w494 interchange,-add transit,-subject of open house star tribune
- 3 October 2013 49435w open house boards
- 7 August 2013 Metro transit gives update on fast bus service sun current
- 27 June 2013 Orange line basic handout
Maps, figures and drawings (27)
2021
2016
- May 2016 Appendix a corridor station area reference maps reduced
- 14 January 2016 Solutions alliance burnsville stations
2015
- August 2015 Burnsville parkway station concept
- July 2015 Nicollet avenue orange line station concept
2014
- November 2014 MN Minneapolis METRO Orange Line Profile FY16
2013
- October 2013 98th street concepts 100413
- October 2013 66th street concepts 100413
- 26 September 2013 Retooled I 35w project would add lake street bus rapid transit station minnpost
2010
- November 2010 FINAL PLAN MAP
- June 2010 135map
- May 2010 Existing map
- May 2010 684map
- May 2010 597map
- May 2010 579map
- May 2010 578map
- May 2010 576map
- May 2010 558map
- May 2010 535map
- May 2010 46map
- May 2010 18map
- May 2010 156map
- May 2010 152map
- May 2010 146map
- May 2010 11map
- May 2010 113map
- 2010 I35W Concept Plan
Other documents (91)
2021
- January 2021 Ol connectingbus execsummary
- January 2021 Molconnectingroutes 7 515
- January 2021 Molconnectingroutes 547 548
- January 2021 Molconnectingroutes 540 542
- January 2021 Molconnectingroutes 536 537 539
- January 2021 Molconnectingroutes 531 553
- January 2021 Molconnectingroutes 27
- January 2021 553
- January 2021 548
- January 2021 547
- January 2021 542
- January 2021 540
- January 2021 539
- January 2021 537
- January 2021 536
- January 2021 534
- January 2021 515
- 2021 Ol connectingbus appb
- 2021 Ol connectingbus appa
- 2021 597
- 2021 538
- 2021 535
2018
- June 2018 06 37 11005 18 35wmapupdates
- 30 April 2018 Schedulegraphic11x17 v10.ada
2017
- 30 January 2017 Downtown cptf
2016
- 1 June 2016 Taac
- 26 February 2016 494 corridor commision tour orange line
- 19 January 2016 DCRRA
- 5 January 2016 DCRRA materials
2015
- 9 December 2015 Bloomington tour orange line
- 13 November 2015 Richfield tour orange line
- 21 October 2015 CTIB orange line 2016 grant
- 19 October 2015 DCRRA
- 14 October 2015 Downtown council orange line overview
- 12 October 2015 Orange line BRT purpose statement
- 7 October 2015 Taac ol overview
- 5 October 2015 Gears corrected
- October 2015 Service
- 22 September 2015 Orange line DCRRA
- 22 September 2015 Bus rapid transit projects move forward in the twin cities startribune
- 10 September 2015 Final orange line solutions alliance tour
- 25 August 2015 Orange line DCRRA
- 21 July 2015 15 HCRRA 0021 hennepin funding committment
2014
- 21 November 2014 Orange line BRT wins federal approval finance and commerce
- 30 October 2014 Orange line BRT secures funding for next two years of development
- 15 October 2014 Orange line 2015 capital grant
- 14 October 2014 Orange line funding commitment HCRRA
- 26 June 2014 Orange line commuter connection
- 12 June 2014 Richfield city council endorses orange line sun current
- 20 May 2014 Orange line tweet chat info
- 8 May 2014 Orange line ppu 35w solutions alliance v2
- 15 April 2014 Second BRT line to dakota county is being planned strib
- 10 April 2014 Orange line governance proposal
- 25 March 2014 Orange line DCRRA
- March 2014 35w solutions alliance orange line governance
2013
- 26 November 2013 Richfield city council knox avenue
- 20 November 2013 Input wanted for proposed orange line BRT the drive startribune
- 24 September 2013 Richfield council
- 23 September 2013 Bloomington council
- 18 September 2013 Orange line intro bloomington chamber
- September 2013 Ol american boulevard orange line options
- 30 August 2013 Orange line pep v3
- 7 August 2013 Orange line intro taac
- 23 July 2013 Orange line richfield city council
- 16 July 2013 Courting developers for penn american district
- 1 July 2013 Orange line bloomington city council final
- 16 May 2013 Orange line bloomington
- 14 May 2013 Orange line intro burnsville city council
- 9 May 2013 Orange line intro 35w solutions alliance
- 2 May 2013 Orange line vision coming into focus
- 12 March 2013 Mnpass lane use is growing startribune
2010
- November 2010 Overview
- November 2010 46thpass
- August 2010 684MAPfinal
- August 2010 597MAPfinal
- August 2010 579MAPfinal
- August 2010 578MAPfinal
- August 2010 576MAPfinal
- August 2010 558MAPfinal
- August 2010 535MAPfinal
- August 2010 46MAPfinal
- August 2010 18MAPfinal
- August 2010 156MAPfinal
- August 2010 152MAPfinal
- August 2010 146MAPfinal
- August 2010 135MAPfinal
- August 2010 11MAPfinal
- August 2010 113MAPfinal
- May 2010 Routedescription
- May 2010 Conceptplanmap
- 2010 46thStreetFINAL