TRANSIT LIBRARY

Southwest Transitway Draft EIS Chapter 2: Alternatives Considered

Open the PDF (17 MB)

Date
October 2012
Kind
Environmental document
From
Hennepin County Regional Railroad Authority (LRL copy)
File
PDF, 58 pages, 17 MB
Published as
SW-DEIS-ch2.pdf
Published at
https://www.lrl.mn.gov/docs/2013/mandated/130370/SW-DEIS-ch2.pdf (still there when last looked)
This copy
from the site that published it
SHA-256
0db61931355dd2a7943250b64b8a99fbf9ca38f48c897ed9062417692f7c5d7a
Filed under
Southwest Corridor
Names these lines
METRO Blue Line ×5, METRO Green Line ×3, Route 615 ×3, Route 17 ×2, Route 25 ×2, Northstar Commuter Rail ×1
♫ NOW PLAYING
No track loaded
0:00
🔊