Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Route 805
16 documents, those that name it most first. The line's own page
- September 2024 Network now report
- March 2025 Appendix a route changes metrotransit 030925 reduced
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- April 2015 00 SIP FinalReport inclAppendices
- September 2024 Network now report appendix a
- March 2015 07 AppendixF SIPImprovementsbyRt
- March 2015 08 AppendixG SIPImprovementsbyRegion
- April 2018 Appendixe summary proposedimprovements
- August 2023 Final Corridor Plan (Aug. 9, 2023)
- September 2024 Network now report appendix b
- May 2011 Regional Transitway Guidelines Technical Report
- October 2022 Draft Corridor Plan (Oct. 24, 2022)
- April 2023 Recommended Corridor Plan (April 12, 2023)
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.