Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Route 763
23 documents, those that name it most first. The line's own page
- September 2024 Network now report
- April 2007 Appendix AllRoutes
- August 2003 Existing Conditions Report
- December 2006 Route763
- July 2012 Bottineau LRT TechRept Transit Operations Plans
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- September 2003 763
- March 2025 Appendix a route changes metrotransit 030925 reduced
- April 2007 04 Final Plan
- September 2024 Network now report appendix a
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- September 2003 NW CH 3
- 11 May 2022 Route 22 engagement summary
- April 2007 05 Plan Impacts
- April 2007 07 Implement Sched
- April 2007 Fig11 ExpressRts
- May 2014 Highway Transitway Corridor Study Tech Memo 3: Corridor concepts and evaluation
- August 2024 Network now final report rsv
- September 2024 Network now report appendix b
- September 2024 Network now report no appendicies small
- September 2003 NW CH 5
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.