Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Route 537
18 documents, those that name it most first. The line's own page
- May 2021 Complete recommended plan
- January 2021 Concept plan full reportfinal
- March 2025 Appendix a route changes metrotransit 030925 reduced
- September 2024 Network now report
- January 2021 Ol connectingbus report
- 21 April 2020 Concept plan engagement summary final
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- May 2021 Recommended plan report
- September 2024 Network now report appendix a
- January 2021 Ol connectingbus execsummary
- December 2018 Open house comments
- January 2019 E line corridor survey responses
- January 2021 Molconnectingroutes 536 537 539
- September 2024 Network now report appendix b
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- May 2021 Recommended plan route 539
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.