Planning documents for the transit lines of the Twin Cities: studies, environmental reviews, committee presentations, meeting notes, open house boards. Agencies take these down when a project ends or a website is rebuilt. The copies here stay.
4,474 documents, 119,279 pages. Each one says where it was published and where its copy came from.
Documents that name Route 134
44 documents, those that name it most first. The line's own page
- June 2012 ConceptPlanReport
- November 2012 RecPlan.2
- February 2014 Finalcctransitstudyreportupdate
- September 2024 Network now report
- October 2019 Chapter 2
- June 2012 134
- April 2014 134 final.2
- October 2012 134.2
- March 2012 ExistingConditionsReport
- June 2012 Chapter4SImprovements
- 2020 Ramsey County 4 to 3 Conversion Study Appendix
- March 2025 Appendix a route changes metrotransit 030925 reduced
- November 2012 Ch4
- November 2012 ExecSummary.2
- June 2012 ExecutiveSummary
- August 2024 Network now final report rsv
- September 2024 Network now report appendix c
- September 2024 Network now report appendix c small
- September 2024 Network now report no appendicies small
- March 2025 Networknowframework 031025
- March 2025 Networknowframework final 031025
- February 2012 Appendix
- October 2019 Chapter 1
- March 2012 Chapter2ExistingRouteStructureandServiceLevels
- June 2012 HuronStationRoutes
- October 2012 HuronStationRoutes.2
- October 2019 Pages from chapter 3.2
- May 2012 Presentation
- November 2015 000 draft c line station plan complete
- January 2016 000 recommended c line station plan complete
- February 2014 Centralcorridorrfinalplan
- November 2012 Ch1
- November 2012 Ch6
- June 2012 Chapter1Demographics
- March 2012 Chapter1IntroductionPurposeScope
- June 2012 Chapter6TitleVI
- 27 June 2023 Executive summary: transit connection assessment between Highland Bridge site, A Line and West 7th (BRC)
- July 2002 F:\Projects\Minneapolis Sector 5\Route_Profiles\m134_40x28.prn
- April 2016 Final C Line Station Plan
- August 2021 Ford Spur final report appendix
- February 2014 Huronstationroutes final.2
- September 2024 Network now report appendix a
- September 2024 Network now report appendix b
- September 2012 PlanChangesClarifications
A copy is taken from the agency that published the document while it is still there, and otherwise from the Internet Archive's Wayback Machine. Things that are not a public body's own documents are linked to where they are published, not copied here.