TRANSIT LIBRARY

FHWA adoption of FTA EA / FONSI

Open the PDF (5.0 MB)

incomplete The only copy that survives was cut short when it was archived: the file ends partway through.

Date
5 March 2020
Kind
Environmental decision
From
FHWA Minnesota Division
File
PDF, 5.0 MB
Published as
rpt_20200305_metrogoldlinebrt_fhwa-fonsi.pdf
Published at
https://www.metrotransit.org/Data/Sites/1/media/about/improvements/gold-line/rpt_20200305_metrogoldlinebrt_fhwa-fonsi.pdf (gone from there)
This copy
from the Wayback Machine's capture of 2025-03-18
SHA-256
848e6e33abb832015f270ccc847019a528b244cfa2e5cd1d98b530c12a877dde
Filed under
Gateway Corridor
β™« NOW PLAYING
No track loaded
0:00
πŸ”Š